Hi-volume air monitoring program. Interim monitoring and quality assurance report /
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to m...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Hi-volume air monitoring program. Interim monitoring and quality assurance report |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1696 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1696. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Measured TSP concentrations
- Quality assurance results.