Hi-volume air monitoring program. Interim monitoring and quality assurance report /
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to m...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Hi-volume air monitoring program. Interim monitoring and quality assurance report |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1696 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1696. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02987nam a2200517Ia 4500 | ||
---|---|---|---|
001 | 2035142 | ||
003 | SIRSI | ||
005 | 20140430092250.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140430s1984 akud bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)878685899 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1696 | |
088 | |a APA 1696 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Hi-volume air monitoring program. |p Interim monitoring and quality assurance report / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Hi-volume air monitoring program. |p Interim monitoring and quality assurance report | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1984] | ||
300 | |a iii, 12 p. : |b charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 1696 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "August 1984." | ||
500 | |a "Susitna File no. 4.8.2." | ||
500 | |a "Federal Energy Regulatory Commission. Project No. 7114"--Cover. | ||
510 | 3 | |a Assigned APA Document no. 1696 in the Susitna Hydroelectric Project document index. | |
513 | |a Final report. | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to measure baseline values of total suspended particulates (TSP), as such particulates caused by natural windblown dust is the only significant air contaminant at the site. Two sites are monitored: the proposed Watana campsite and another site along the Susitna River over three miles away. This report presents the preliminary results of the program conducted at the Watana campsite for the period May 30 to August 10, 1984. It is the second of three reports written for this program being submitted to ADEC. | ||
505 | 0 | |a Introduction -- Measured TSP concentrations -- Quality assurance results. | |
504 | |a Includes bibliographical references (p. 12). | ||
650 | 0 | |a Air quality |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Particles |x Measurement. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Environmental aspects |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Dams |x Design and construction |x Environmental aspects |z Alaska |z Susitna River Valley. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1696. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/16/APA1696.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01696 |