Yukon river bridge use risk analysis executive summary

This work discusses the risk analysis of alternative methods for transporting natural gas across the Yukon River in Alaska and alternative methods that include both the use of the existing Yukon bridge and possible new crossings.

Saved in:
Bibliographic Details
Corporate Author: Acres American Incorporated
Corporate Contributor(s):Fluor Engineers and Constructors, Inc.
Document Type: Executive summary
Publisher:Acres American Incorporated
Date:January 1982
Funding Numbers:Contract no. 4780-9-K208
Sponsor / Funder:Fluor Engineers and Constructors, Inc.
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 01123cmm a22003133 4500
001 1470295
003 SIRSI
008 121009n1982 000 0 eng u
110 1 |a Acres American Incorporated 
245 |a Yukon river bridge use risk analysis executive summary 
260 |a Acres American Incorporated 
518 |a January 1982 
300 |a 36 p. 
380 |a Executive summary 
546 |a English 
536 |a Contract no. 4780-9-K208 
520 |a This work discusses the risk analysis of alternative methods for transporting natural gas across the Yukon River in Alaska and alternative methods that include both the use of the existing Yukon bridge and possible new crossings. 
653 |a Risk analysis 
653 |a Feasibility 
653 |a Project analysis 
653 |a Environmental analysis 
653 |a Dredging 
653 |a Waterbodies 
651 |a Yukon River 
690 |a PF-ENVI 
690 |a PF-PROJ 
710 |a Fluor Engineers and Constructors, Inc. 
856 |u https://www.arlis.org/docs/vol1/AlaskaGas/ExecSumm/ExecSumm_AAI_1982_YukonRiverBridgeRiskAnalysis.pdf 
596 |a 10