Yukon river bridge use risk analysis executive summary
This work discusses the risk analysis of alternative methods for transporting natural gas across the Yukon River in Alaska and alternative methods that include both the use of the existing Yukon bridge and possible new crossings.
Saved in:
Corporate Author: | |
---|---|
Corporate Contributor(s): | Fluor Engineers and Constructors, Inc. |
Document Type: | Executive summary |
Publisher: | Acres American Incorporated |
Date: | January 1982 |
Funding Numbers: | Contract no. 4780-9-K208 |
Sponsor / Funder: | Fluor Engineers and Constructors, Inc. |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
Summary: | This work discusses the risk analysis of alternative methods for transporting natural gas across the Yukon River in Alaska and alternative methods that include both the use of the existing Yukon bridge and possible new crossings. |
---|---|
Physical Description: | 36 p. |