Draft terrestrial plan of study, fiscal year 1985 : report /
"Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)....
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Fiscal year 1985 terrestrial plan of study Susitna Hydroelectric Project. Draft terrestrial plan of study, fiscal year 1985 : report |
---|---|
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1199 SUS 283 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1199. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02695cam a2200541Ia 4500 | ||
---|---|---|---|
001 | 375823 | ||
003 | SIRSI | ||
005 | 20120627085315.0 | ||
007 | he bmu---bbca | ||
007 | cr cn||||a|||| | ||
008 | 030623s1984 akub t s000 0 eng d | ||
035 | |a (OCoLC)52481273 | ||
040 | |a RLA |c RLA |d OCLCQ |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 1199 | ||
088 | |a SUS 283 | ||
090 | |a TK1425.S8 |b F472 no. 1199 | ||
245 | 0 | 0 | |a Draft terrestrial plan of study, fiscal year 1985 : |b report / |c by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 1 | 6 | |a Susitna Hydroelectric Project. |p Fiscal year 1985 terrestrial plan of study |
246 | 3 | |a Susitna Hydroelectric Project. |p Draft terrestrial plan of study, fiscal year 1985 : |b report | |
260 | |a [Anchorage] : |b Alaska Power Authority, |c [1984] | ||
300 | |a ii, 92 leaves : |b maps ; |c 28 cm. | ||
490 | 1 | |a Document ; |v no. 1199 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
513 | |a Draft report. | ||
500 | |a "March 1984." | ||
500 | |a "Federal Energy Regulatory Commission project no. 7114"--Cover. | ||
510 | 3 | |a Assigned APA document no. 1199 in Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned SUS document no. 283 in the AEIDC index. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a "Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)."--P. 1. | ||
505 | 2 | |a Long term goals of the Power Authority -- Terrestrial study team participants -- FY85 study descriptions and prioritization. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Environmental aspects. |
650 | 0 | |a Ecological assessment (Biology) |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Environmental impact analysis |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River Valley. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1199. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/11/APA1199.pdf |z ARLIS Document Server |
901 | |a 3755 |f orig | ||
596 | |a 9 10 | ||
098 | |a SUS 00283 | ||
098 | |a APA 01199 |