Draft terrestrial plan of study, fiscal year 1985 : report /

"Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)....

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Fiscal year 1985 terrestrial plan of study

Susitna Hydroelectric Project. Draft terrestrial plan of study, fiscal year 1985 : report
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1199

SUS 283
Series:Document (Susitna Hydroelectric Project) ; no. 1199.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02695cam a2200541Ia 4500
001 375823
003 SIRSI
005 20120627085315.0
007 he bmu---bbca
007 cr cn||||a||||
008 030623s1984 akub t s000 0 eng d
035 |a (OCoLC)52481273 
040 |a RLA  |c RLA  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 1199 
088 |a SUS 283 
090 |a TK1425.S8  |b F472 no. 1199 
245 0 0 |a Draft terrestrial plan of study, fiscal year 1985 :  |b report /  |c by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 1 6 |a Susitna Hydroelectric Project.  |p Fiscal year 1985 terrestrial plan of study 
246 3 |a Susitna Hydroelectric Project.  |p Draft terrestrial plan of study, fiscal year 1985 :  |b report 
260 |a [Anchorage] :  |b Alaska Power Authority,  |c [1984] 
300 |a ii, 92 leaves :  |b maps ;  |c 28 cm. 
490 1 |a Document ;  |v no. 1199 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Draft report. 
500 |a "March 1984." 
500 |a "Federal Energy Regulatory Commission project no. 7114"--Cover. 
510 3 |a Assigned APA document no. 1199 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned SUS document no. 283 in the AEIDC index. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)."--P. 1. 
505 2 |a Long term goals of the Power Authority -- Terrestrial study team participants -- FY85 study descriptions and prioritization. 
610 2 0 |a Susitna Hydroelectric Project  |x Environmental aspects. 
650 0 |a Ecological assessment (Biology)  |z Alaska  |z Susitna River Valley. 
650 0 |a Environmental impact analysis  |z Alaska  |z Susitna River Valley. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River Valley. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River Valley. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1199. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/11/APA1199.pdf  |z ARLIS Document Server 
901 |a 3755  |f orig 
596 |a 9 10 
098 |a SUS 00283 
098 |a APA 01199