Draft terrestrial plan of study, fiscal year 1985 : report /
"Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)....
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Fiscal year 1985 terrestrial plan of study Susitna Hydroelectric Project. Draft terrestrial plan of study, fiscal year 1985 : report |
---|---|
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1199 SUS 283 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1199. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "Although the license application has been accepted by the FERC for review, various terrestrial studies and activities are still needed to assure that the licensing process proceeds on schedule. This document outlines the draft plans for these studies and activities for fiscal year 1985 (FY85)."--P. 1. |
---|---|
Physical Description: | ii, 92 leaves : maps ; 28 cm. |
Notes: | At head of title: Susitna Hydroelectric Project. "March 1984." "Federal Energy Regulatory Commission project no. 7114"--Cover. |
Report Type: | Draft report. |