Letter from Wayne Dyok to James W. Balsiger, October 7, 2014, in response to National Marine Fisheries Service's comments on Initial Study Report on Susitna-Watana Hydroelectric Project.

This document is the response from Alaska Energy Authority (AEA) to the the letter dated September 22, 2014, from the Alaska Regional Office of the National Marine Fisheries Service. That letter respresents the comments from the Juneau Office to AEA's Initial Study Report (ISR) for the Susitna-...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title in subject line: Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000

Letter from James W. Balsiger to Wayne Dyok, September 22, 2014, providing National Marine Fisheries Service's comments on the Initial Study Report for the Susitna-Watana Hydroelectric Project.

Initial Study Report.
Main Author: Dyok, Wayne,
Additional Author(s):Balsiger, James W.,

Balsiger, James W.
Corporate Contributor(s):Alaska Energy Authority,

United States. National Marine Fisheries Service. Alaska Regional Office,
Report Numbers:SuWa 306
Original Source:Critique of evaluation of: Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 306.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document is the response from Alaska Energy Authority (AEA) to the the letter dated September 22, 2014, from the Alaska Regional Office of the National Marine Fisheries Service. That letter respresents the comments from the Juneau Office to AEA's Initial Study Report (ISR) for the Susitna-Watana Hydroelectric Project (FERC No. 14241). This correspondence consists of a three-page letter dated October 7, 2014, from Wayne Dyok, Susitna-Watana Project Manager at the Alaska Energy Authority, to James W. Balsiger, Alaska Region Administrator, with attachments. The attachments include (1) a comment-response table and (2) the original comment letter with its three enclosures (numbered SuWa 305). The ISR comprises sixty volumes and was first released in June 2014 and completed in 2015. The ISR is required by the Federal Energy Regulatory Commission (FERC) for the licensing of the proposed project, and is numbered SuWa 223.
Physical Description:3, 28, 17 pages ; 28 cm.
Notes:Title devised by cataloger.

Letterhead: Alaska Energy Authority.

"October 7, 2014."

ARLIS assigned report number: SuWa 306.

This document is posting 20141008-5071 of: [FERC eSubscription to Docket 14241, Susitna-Watana Hydroelectric Project]. -- (Susitna-Watana Hydroelectric Project document ; no. 288).
Original Source:Critique of evaluation of: Initial Study Report.
Bibliography:Includes bibliographical references (pages 24-26).
Related Items:A response to: Letter from James W. Balsiger to Wayne Dyok, September 22, 2014, providing National Marine Fisheries Service's comments on the Initial Study Report for the Susitna-Watana Hydroelectric Project. -- 2014 September 22. -- (Susitna-Watana Hydroelectric Project document ; no. 305).