AEA Susitna-Watana BOC Meeting - comment and response log.

This document contains comments and responses (in tabular form) from the first three meetings of Susitna-Watana Hydroelectric Project Independent Board of Consultants held in 2012 and 2013. The comments and questions arose during the meeting. The responses are from various participants, and most are...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on caption on pages 1-5: AEA Susitna-Watana BOC Meeting #1 in Bellevue, WA (November 1-2, 2012) - comment and response log

Title on caption on pages 7-9: AEA Susitna-Watana BOC Meeting #2 in Bellevue, WA (March 7-8, 2013) - comment and response log

Title on caption on pages 10-11: AEA Susitna-Watana BOC Meeting #3 in Anchorage, AK (May 29-30th, 2013) - comment and response log
Corporate Author: Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors.
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (1st : 2012 : Bellevue, Wash.)

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (2nd : 2013 March : Bellevue, Wash.)

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (3rd : 2013 May : Anchorage, Alaska)
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 279
Series:Susitna-Watana Hydroelectric Project document ; no. 279.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04084cam a2200577Ia 4500
001 2616463
003 SIRSI
005 20150616024220.0
007 ta
007 cr cn||||a||||
008 150616s2014 aku s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)911078555 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 279 
088 |a SuWa 279 
049 |a RLAA 
110 2 |a Susitna-Watana Hydroelectric Project.  |b Independent Board of Consultants and Advisors. 
245 1 0 |a AEA Susitna-Watana BOC Meeting - comment and response log. 
246 1 |i Title on caption on pages 1-5:  |a AEA Susitna-Watana BOC Meeting #1 in Bellevue, WA (November 1-2, 2012) - comment and response log 
246 1 |i Title on caption on pages 7-9:  |a AEA Susitna-Watana BOC Meeting #2 in Bellevue, WA (March 7-8, 2013) - comment and response log 
246 1 |i Title on caption on pages 10-11:  |a AEA Susitna-Watana BOC Meeting #3 in Anchorage, AK (May 29-30th, 2013) - comment and response log 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a 11 p. ;  |c 28 x 43 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 279 
500 |a Title from Project's Document webpage as listed under the category "Board of Consultant meeting." 
500 |a ARLIS assigned report number: SuWa 279. 
510 3 |a Listed in April 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Board of Consultant meeting. 
513 |a Board of Consultant meeting. 
500 |a This document was filed as an attachment to: Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. (SuWa 276). 
530 |a Available also in electronic format on the Internet. 
520 |a This document contains comments and responses (in tabular form) from the first three meetings of Susitna-Watana Hydroelectric Project Independent Board of Consultants held in 2012 and 2013. The comments and questions arose during the meeting. The responses are from various participants, and most are dated (dates range from May 13, 2013 to January 24, 2014). The purpose of the meeting was to solicit advice on the Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) studies, related research on storms, the Site Specific Seismic Hazards Analysis studies, RCC dam feasibility, and dam design. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |v Congresses. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
787 0 8 |i Originally submitted as an attachment to:  |a Carey, Bryan.  |t Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK.  |d [Anchorage] : Alaska Energy Authority, [2014]  |w (OCoLC)911078638 
650 0 |a Earthquake hazard analysis  |z Alaska  |z Susitna River Region  |v Congresses. 
650 0 |a Streamflow  |z Alaska  |z Susitna River  |v Congresses. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Susitna-Watana Hydroelectric Project.  |b Independent Board of Consultants and Advisors.  |b Meeting  |n (1st :  |c 2012 :  |d Bellevue, Wash.) 
710 2 |a Susitna-Watana Hydroelectric Project.  |b Independent Board of Consultants and Advisors.  |b Meeting  |n (2nd :  |c 2013 March :  |d Bellevue, Wash.) 
710 2 |a Susitna-Watana Hydroelectric Project.  |b Independent Board of Consultants and Advisors.  |b Meeting  |n (3rd :  |c 2013 May :  |d Anchorage, Alaska) 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 279. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa279.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa276.html  |3 List of related documents: the meeting letter of April 29, 2014 and all attachments (SuWa 276-279).  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00279