AEA Susitna-Watana BOC Meeting - comment and response log.

This document contains comments and responses (in tabular form) from the first three meetings of Susitna-Watana Hydroelectric Project Independent Board of Consultants held in 2012 and 2013. The comments and questions arose during the meeting. The responses are from various participants, and most are...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on caption on pages 1-5: AEA Susitna-Watana BOC Meeting #1 in Bellevue, WA (November 1-2, 2012) - comment and response log

Title on caption on pages 7-9: AEA Susitna-Watana BOC Meeting #2 in Bellevue, WA (March 7-8, 2013) - comment and response log

Title on caption on pages 10-11: AEA Susitna-Watana BOC Meeting #3 in Anchorage, AK (May 29-30th, 2013) - comment and response log
Corporate Author: Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors.
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (1st : 2012 : Bellevue, Wash.)

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (2nd : 2013 March : Bellevue, Wash.)

Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (3rd : 2013 May : Anchorage, Alaska)
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 279
Series:Susitna-Watana Hydroelectric Project document ; no. 279.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document contains comments and responses (in tabular form) from the first three meetings of Susitna-Watana Hydroelectric Project Independent Board of Consultants held in 2012 and 2013. The comments and questions arose during the meeting. The responses are from various participants, and most are dated (dates range from May 13, 2013 to January 24, 2014). The purpose of the meeting was to solicit advice on the Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) studies, related research on storms, the Site Specific Seismic Hazards Analysis studies, RCC dam feasibility, and dam design.
Physical Description:11 p. ; 28 x 43 cm.
Notes:Title from Project's Document webpage as listed under the category "Board of Consultant meeting."

ARLIS assigned report number: SuWa 279.

This document was filed as an attachment to: Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. (SuWa 276).
Report Type:Board of Consultant meeting.
Related Titles:Originally submitted as an attachment to: Carey, Bryan. Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. [Anchorage] : Alaska Energy Authority, [2014]