Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report /
Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.
Saved in:
Contents:
- Introduction
- Summary
- Scope of work
- Selection of plans
- Evaluation of plans
- Identification of conflicts
- Plan recommendation
- Mitigation recommendations
- Tradeoffs in the selection process
- Recommendations for continuing work
- appendix A. Correspondence
- appendix B. Project construction requirements scheduling, Task 2, Surveys and site facilities
- appendix C. Draft summary of environmental report, Task 2, Surveys and site facilities
- appendix D. Contingency risk methodology.