Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report /

Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report

Subtask 2.10, Access roads, closeout reports, access route selection report

Access roads, closeout reports, access route selection report

Access road selection, summary report

Alaska Power Authority, Susitna Hydroelectric Project, Access road selection, summary report

Task 2, Surveys and site facilities. Draft summary of environmental report.

Task 2, Surveys and site facilities. Project construction requirements, scheduling.
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 7

APA 1510

SUS 60
Original Source:Task 2, Surveys and site facilities. Draft summary of environmental report.

Task 2, Surveys and site facilities. Project construction requirements, scheduling.
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 7.
Document (Susitna Hydroelectric Project) ; no. 1510.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary
  • Scope of work
  • Selection of plans
  • Evaluation of plans
  • Identification of conflicts
  • Plan recommendation
  • Mitigation recommendations
  • Tradeoffs in the selection process
  • Recommendations for continuing work
  • appendix A. Correspondence
  • appendix B. Project construction requirements scheduling, Task 2, Surveys and site facilities
  • appendix C. Draft summary of environmental report, Task 2, Surveys and site facilities
  • appendix D. Contingency risk methodology.