Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report /

Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report

Subtask 2.10, Access roads, closeout reports, access route selection report

Access roads, closeout reports, access route selection report

Access road selection, summary report

Alaska Power Authority, Susitna Hydroelectric Project, Access road selection, summary report

Task 2, Surveys and site facilities. Draft summary of environmental report.

Task 2, Surveys and site facilities. Project construction requirements, scheduling.
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 7

APA 1510

SUS 60
Original Source:Task 2, Surveys and site facilities. Draft summary of environmental report.

Task 2, Surveys and site facilities. Project construction requirements, scheduling.
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 7.
Document (Susitna Hydroelectric Project) ; no. 1510.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.
Physical Description:144 leaves in various foliations : ill., maps, forms ; 28 cm.
Notes:Title from cover. Title page missing?

At head of cover title: Susitna Hydroelectric Project.

At head of caption title: Alaska Power Authority, Susitna Hydroelectric Project.

"March 1982."

Appendix B is same as APA 3310 (SUS 81) (uniform title: Task 2, Surveys and site facilities. Project construction requirements, scheduling).

APA 1510 is very similar to APA 1212. APA 1510 lacks a title page and some figures are misplaced, but the table of contents page numbering is complete.

Appendix C is same as APA 1210 (SUS 80) (uniform title: Task 2, Surveys and site facilities. Draft summary of environmental report), but omits the blue-line map.
Original Source:Task 2, Surveys and site facilities. Draft summary of environmental report.

Task 2, Surveys and site facilities. Project construction requirements, scheduling.
Bibliography:Includes bibliographical references.