Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report /
Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.
Saved in:
Summary: | Presents the results of studies conducted to date by Acres to determine the optimum location of the access route. |
---|---|
Physical Description: | 144 leaves in various foliations : ill., maps, forms ; 28 cm. |
Notes: | Title from cover. Title page missing? At head of cover title: Susitna Hydroelectric Project. At head of caption title: Alaska Power Authority, Susitna Hydroelectric Project. "March 1982." Appendix B is same as APA 3310 (SUS 81) (uniform title: Task 2, Surveys and site facilities. Project construction requirements, scheduling). APA 1510 is very similar to APA 1212. APA 1510 lacks a title page and some figures are misplaced, but the table of contents page numbering is complete. Appendix C is same as APA 1210 (SUS 80) (uniform title: Task 2, Surveys and site facilities. Draft summary of environmental report), but omits the blue-line map. |
Original Source: | Task 2, Surveys and site facilities. Draft summary of environmental report. Task 2, Surveys and site facilities. Project construction requirements, scheduling. |
Bibliography: | Includes bibliographical references. |