South Central Railbelt area--Susitna River basin : Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoir hydroelectric project.
Saved in:
Alternate Title: | Frequently cited only by the subtitle: Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoirs hydroelectric project Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project. Pre-authorization assessment of the Susitna River hydroelectric projects. |
---|---|
Additional Author(s): | Friese, Nancy V. Riis, Jim. McIlroy, Carl William. |
Corporate Contributor(s): | U.S. Fish and Wildlife Service. Alaska. Department of Fish and Game. |
Publisher: | U.S. Dept. of the Interior, Fish and Wildlife Service : Alaska Fish & Game, |
Report Numbers: | APA 1611 RTS 2 SUS 30 |
Funding Numbers: | "Studies were conducted by the Alaska Department of Fish and Game under a contract agreement with the U.S. Fish and Wildlife Service" |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1611. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project /
- by Nancy V. Friese.
- [108-page version]
- Pre-authorization assessment of the Susitna River hydroelectric projects : preliminary investigations of water quality and aquatic species composition, Sport Fish section /
- by James C. Riis.
- [Feb. 1976 version]
- Pre-authorization assessment of the Susitna hydroelectric projects : a limited wildlife study, Game Division section /
- by Carl McIlroy and Ted Spraker.