South Central Railbelt area--Susitna River basin : Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoir hydroelectric project.

Saved in:
Bibliographic Details
Alternate Title:Frequently cited only by the subtitle: Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoirs hydroelectric project

Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project.

Pre-authorization assessment of the Susitna River hydroelectric projects.
Additional Author(s):Friese, Nancy V.

Riis, Jim.

McIlroy, Carl William.
Corporate Contributor(s):U.S. Fish and Wildlife Service.

Alaska. Department of Fish and Game.
Publisher:U.S. Dept. of the Interior, Fish and Wildlife Service : Alaska Fish & Game,
Report Numbers:APA 1611

RTS 2

SUS 30
Funding Numbers:"Studies were conducted by the Alaska Department of Fish and Game under a contract agreement with the U.S. Fish and Wildlife Service"
Series:Document (Susitna Hydroelectric Project) ; no. 1611.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 06264cam a2200769Ia 4500
001 234046
003 SIRSI
005 20160531015152.0
007 ta
007 he bmu---bbca
007 cr cn||||a||||
008 811103s1976 akuabf bt f000 0 eng d
040 |a UDA  |b eng  |c UDA  |d OCLCQ  |d RLA  |d OCLCQ  |d OCLCA  |d OCLCF  |d OCLCQ  |d OCL  |d RLA 
035 |a (OCoLC)7902055 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 1611 
050 4 |a QL161  |b .S68 1976 
088 |a APA 1611 
088 |a RTS 2 
088 |a SUS 30 
049 |a RLAA 
245 0 0 |a South Central Railbelt area--Susitna River basin :  |b Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoir hydroelectric project. 
246 1 |i Frequently cited only by the subtitle:  |a Fish and Wildlife studies related to the Corps of Engineers Devil Canyon, Watana Reservoirs hydroelectric project 
260 |a Anchorage, Alaska :  |b U.S. Dept. of the Interior, Fish and Wildlife Service :  |b Alaska Fish & Game,  |c [1976] 
300 |a 198 pages in various pagings, [11] folded leaves of plates :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cover title. 
500 |a This publication is entered under the subtitle in the ADF & G Susitna River Aquatic Studies bibliography, in the Susitna Hydroelectric Project document index, and on the microfiche header. 
536 |a "Studies were conducted by the Alaska Department of Fish and Game under a contract agreement with the U.S. Fish and Wildlife Service" 
500 |a "February 1976." 
510 3 |a Assigned APA Document no. 1611 in Susitna Hydroelectric Project document index, but is erroneously entered under the title for the first work (the paper by Friese). 
510 3 |a Assigned RTS document no. 2 in the ADF & G document bibliography. That bibliography erroneously refers to this title as APA Document no. 549 (that number belongs only to the first work in this publication). 
510 3 |a Assigned number SUS 30 in the Susitna Aquatic Impact Assessment Project bibliography. 
500 |a Comprises three works, each also distributed and cataloged separately with individual document numbering. 
500 |a First work is APA Document no. 549 in the Susitna Hydroelectric Project document index. All three works assigned SUS numbers: SUS 10003 (first work), SUS 10002 (second work), SUS 10001 (third work). 
505 0 0 |t Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project /  |r by Nancy V. Friese.  |g [108-page version] --  |t Pre-authorization assessment of the Susitna River hydroelectric projects : preliminary investigations of water quality and aquatic species composition, Sport Fish section /  |r by James C. Riis.  |g [Feb. 1976 version] --  |t Pre-authorization assessment of the Susitna hydroelectric projects : a limited wildlife study, Game Division section /  |r by Carl McIlroy and Ted Spraker. 
500 |a Some copies distributed without the 11 folded plates of aerial photographs constituting the appendix of the second work. Some copies distributed with the title page and table of contents of the third work placed erroneously before p. 1 of the second work. 
500 |a The first work (by Friese)--is paged "v, 108 p." Another version of this work was published as Upper Cook Inlet data report no. 75-02 (series lacking on piece) in 120 pages. Both versions are dated Nov. 1975 and have the same text, but paging is reformatted. 
500 |a The second work (by Riis)--is paged "iv, 50 p." and includes 11 plates. An undated version was issued with identical text but with different aerial plates and in different layout. It is paged "iv, 61 leaves" and includes 6 plates, and is possibly an earlier draft. In May 1977 a version with substantially different content was published with "proposed" appearing before "Susitna" in the title; it is paged "vii, 91 leaves" without plates. 
530 |a Available also in electronic format on the Internet. 
530 |a Also issued in microfiche, but plates of aerial photographs in second work were not filmed. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Anadromous fishes  |x Effect of dams on  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Water quality  |z Alaska  |z Susitna River Watershed. 
650 0 |a Aquatic organisms  |z Alaska  |z Susitna River Watershed. 
650 0 |a Moose  |z Alaska  |z Susitna River Valley. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Environmental aspects. 
700 1 2 |a Friese, Nancy V.  |t Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project.  |s 108-page version. 
700 1 2 |a Riis, Jim.  |t Pre-authorization assessment of the Susitna River hydroelectric projects.  |s Feb. 1976 version. 
700 1 2 |a McIlroy, Carl William.  |t Pre-authorization assessment of the Susitna River hydroelectric projects. 
710 2 |a U.S. Fish and Wildlife Service. 
740 0 2 |a Pre-authorization assessment of the Susitna hydroelectric projects : a limited wildlife study, Game Division section. 
710 1 |a Alaska.  |b Department of Fish and Game. 
740 0 2 |a Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devil Canyon hydroelectric project. 
740 0 2 |a Pre-authorization assessment of the Susitna River hydroelectric projects : preliminary investigations of water quality and aquatic species composition, Sport Fish section. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1611. 
596 |a 9 10 23 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/16/APA1611.pdf  |z Size: 61.6 MB.  |z ARLIS Document Server 
590 |a ARLIS: Printing errors are corrected in ARLIS paper copies. 
098 |a RTS 00002 
098 |a SUS 00030 
098 |a APA 01611