FERC license application. Exhibit C /

Exhibit C outlines the construction schedule for the proposed Watana Dam (to meet online power in 1993) and Devil Canyon Dam (to meet online power in 2002). The entire construction schedule spans the period 1983 to 2004.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. FERC license application. Exhibit C

Title at head of table of contents: Exhibit C. Construction schedule
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1372
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1372.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02811cam a2200505Ia 4500
001 2046914
003 SIRSI
005 20140715134714.0
007 ta
007 cr bn||a||||||
008 140715s1982 akua s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)883665414 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F471 no. 1372 
088 |a APA 1372 
245 0 0 |a FERC license application.  |n Exhibit C /  |c prepared by Acres. 
246 3 |a Susitna Hydroelectric Project.  |p FERC license application.  |n Exhibit C 
246 1 |i Title at head of table of contents:  |a Exhibit C.  |p Construction schedule 
250 |a 1st draft. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a 4, [2] leaves :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a "September 24, 1982." 
510 3 |a Assigned APA Document no. 1372 in the Susitna Hydroelectric Project document index. 
500 |a This volume was later revised and incorporated into volume 1 of: Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. 1983. Volume 1: Initial statement ; Exhibit A. Project description ; Exhibit C. Proposed construction schedule ; Exhibit D. Project costs and financing ; Appendix D-1. Fuels pricing studies. (APA 123, 637, or 1792 ; SUS 140 or 192). 
530 |a Available also in electronic format on the Internet. 
520 |a Exhibit C outlines the construction schedule for the proposed Watana Dam (to meet online power in 1993) and Devil Canyon Dam (to meet online power in 2002). The entire construction schedule spans the period 1983 to 2004. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction. 
650 0 |a Hydroelectric power plants  |x Licenses  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Licenses  |z Alaska  |z Susitna River. 
650 0 |a Scheduling. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
787 0 8 |i Absorbed by and replaced in part by:  |t Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. Volume 1. Initial statement ; Exhibit A ; Exhibit C ; Exhibit D.  |d [Anchorage] : Alaska Power Authority, [1983]  |r APA 123, 637, or 1792  |r SUS 140 or 192 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1372. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1372.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01372