FERC license application. Exhibit C /

Exhibit C outlines the construction schedule for the proposed Watana Dam (to meet online power in 1993) and Devil Canyon Dam (to meet online power in 2002). The entire construction schedule spans the period 1983 to 2004.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. FERC license application. Exhibit C

Title at head of table of contents: Exhibit C. Construction schedule
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1372
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1372.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Exhibit C outlines the construction schedule for the proposed Watana Dam (to meet online power in 1993) and Devil Canyon Dam (to meet online power in 2002). The entire construction schedule spans the period 1983 to 2004.
Physical Description:4, [2] leaves : ill. ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"September 24, 1982."

This volume was later revised and incorporated into volume 1 of: Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. 1983. Volume 1: Initial statement ; Exhibit A. Project description ; Exhibit C. Proposed construction schedule ; Exhibit D. Project costs and financing ; Appendix D-1. Fuels pricing studies. (APA 123, 637, or 1792 ; SUS 140 or 192).
Related Titles:Absorbed by and replaced in part by: Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project. Volume 1. Initial statement ; Exhibit A ; Exhibit C ; Exhibit D. [Anchorage] : Alaska Power Authority, [1983] APA 123, 637, or 1792 SUS 140 or 192