Unit prices - backup calculations, Watana Dam/Devil Canyon production rates, Watana.

A collection of hand completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. These sheets cover all types of facilities including powerhouses, access tunnels and shafts...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book C. Unit prices - backup calculations, Watana Dam/Devil Canyon production rates, Watana.

(C). Unit prices - backup calculations, Watana Dam/Devil Canyon production rates, Watana

Book C. Watana Dam/Devil Canyon production rates

Watana Dam/Devil Canyon production rates

Title in the Susitna Hydroelectric Project document index: Watana/Devil Canyon production rates (underground), Book C, Task 9 - Group 12
Corporate Contributor(s):Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 254
Series:Document (Susitna Hydroelectric Project) ; no. 254.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A collection of hand completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. These sheets cover all types of facilities including powerhouses, access tunnels and shafts, fire protection headtanks, cable shafts, surge chambers, penstocks, transformer galleries, and so forth.
Physical Description:204 [i.e. 178] p. : ill. ; 28 cm.
Notes:Title from caption on page 2 (table of contents page); page 1 missing?

At head of title: (C).

Handwritten on cover label: Task 9 - Group 2 [i.e. 12?].

This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc.

Pages are numbered by hand on the bottom through 204; some pages missing or not included. Total number of pages is 178.