Step 1 report preparation for Susitna Project, need for power study /
Saved in:
Main Author: | |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. |
Report Numbers: | APA 2369 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2369. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | [10] p. ; 28 cm. |
---|---|
Notes: | Typescript. At head of first page: Memorandum. Title from subject line. Memorandum to Head for Power Study Team from Henry H. Chen dated January 31, 1983. The Susitna Hydroelectric Project document index states this memorandum is from Harza-Ebasco Susitna Joint Venture. Series statement from label on cover. In this memorandum briefly describes the plans to prepare two documents by the Power Study Team at Harza-Ebasco and outlines the contents. The first document is tentatively called "Susitna Project, initial review and evaluation : power market forecast." The second document is tentatively called "Susitna Project, initial review and evaluation : project optimization and justification." |