Feasibility report project manual /
The purpose of this project manual is to set forth standard procedures for preparation of text, plates and drawings, editing, proofreading, checking and production of the feasibility report for the Susitna Hydroelectric Project to be issued in February 1982. (The first draft is numbered APA 1291-129...
Saved in:
Alternate Title: | Project manual, Subtask 6.31, Feasibility report |
---|---|
Corporate Contributor(s): | Acres American Incorporated. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1290 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1290. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The purpose of this project manual is to set forth standard procedures for preparation of text, plates and drawings, editing, proofreading, checking and production of the feasibility report for the Susitna Hydroelectric Project to be issued in February 1982. (The first draft is numbered APA 1291-1292.) The manual also includes a schedule for preparation of the report and an outline of the contents. |
---|---|
Physical Description: | [93] p. : forms ; 28 cm. |
Notes: | "December 21, 1981." |
Related Titles: | Project manual for: Feasibility report. Volume 1, Engineering and economic aspects. 1st draft. [Anchorage, Alaska] : Alaska Power Authority, [1982] APA 1291-1292 |