Subtask 11.01, Project overview, project manual.
This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 11.01, Project overview, project manual Project overview, project manual |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1366 |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1366. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned compilation of material on technical, commercial, economic, financial, contractual, and environmental aspects. |
---|---|
Physical Description: | [125] p. : ill. ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. Letter of transmittal dated November 17, 1980. |