Hydroelectric power and related purposes, southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report /

"The purpose of this supplemental feasibility study was to reevaluate the economic justification of the proposed upper Susitna River basin hydropower development."--Summary in Main report.

Saved in:
Bibliographic Details
Alternate Title:Southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report, hydroelectric power and related purposes
Corporate Contributor(s):United States. Army. Corps of Engineers. Alaska District.
Publisher:U.S. Dept. of the Army, Corps of Engineers, Alaska District,
Report Numbers:APA 2365

APA 2366

APA 2367
Series:Document (Susitna Hydroelectric Project) ; no. 2365-2367.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03602cam a2200685Ia 4500
001 1554505
003 SIRSI
005 20160425084301.0
007 ta
007 cr cn||||a||||
008 801024s1979 akuab bt f000 0 eng d
040 |a UDA  |b eng  |c UDA  |d OCLCQ  |d RLA  |d OCLCQ  |d RLA  |d OCLCA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)6858124 
043 |a n-us-ak 
050 4 |a TK1424.A4  |b U5283 1979 
050 4 |a TK1425.S8  |b A23 no. 2365-2367 
088 |a APA 2365 
088 |a APA 2366 
088 |a APA 2367 
049 |a RLAA 
245 0 0 |a Hydroelectric power and related purposes, southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report /  |c prepared by the Alaska District, Corps of Engineers, Department of the Army. 
246 1 4 |a Southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report, hydroelectric power and related purposes 
260 |a Anchorage, Alaska :  |b U.S. Dept. of the Army, Corps of Engineers, Alaska District,  |c 1979. 
300 |a 3 volumes :  |b illustrations, maps (some folded) ;  |c 27 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "February 1979." 
510 3 |a Assigned APA Document numbers 2365-2367 in Susitna Hydroelectric Project document index. This report was used as supporting documentation in research by the Susitna Hydroelectric Project. 
530 |a Available also in electronic format on the Internet. 
520 |a "The purpose of this supplemental feasibility study was to reevaluate the economic justification of the proposed upper Susitna River basin hydropower development."--Summary in Main report. 
505 0 |a Main report. (APA 2366) -- Appendix, pt. 1. (APA 2365) -- Appendix, pt. 2. (APA 2367). 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River. 
650 0 |a Water-power  |z Alaska  |z Susitna River Watershed. 
650 0 |a Water resources development  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Power utilization. 
650 7 |a Water resources development.  |2 fast  |0 (OCoLC)fst01171955 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Hydroelectric power plants.  |2 fast  |0 (OCoLC)fst00964930 
650 7 |a Water-power.  |2 fast  |0 (OCoLC)fst01172317 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
651 7 |a Alaska  |z Susitna River Watershed.  |2 fast  |0 (OCoLC)fst01265160 
710 1 |a United States.  |b Army.  |b Corps of Engineers.  |b Alaska District. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/23/APA2365.pdf  |3 Direct link to the first volume (Main report).  |z ARLIS Document Server 
772 0 |t Southcentral Railbelt area, Alaska, interim feasibility report, hydroelectric power and related purposes for the upper Susitna River basin.  |d [Anchorage, Alaska? : Alaska District, Corps of Engineers, Dept. of the Army, 1975-1976]  |w (OCoLC)785838101 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2365-2367.  |5 AkARLIS 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/23/APA2365.html  |3 List of all volumes.  |z ARLIS Document Server 
035 |a (Sirsi) CCL71882 
035 |a (OCoLC)06858124 
090 |a TK1424.A4  |b U5283 1979 
090 |a TK1425.S8  |b A23 no. 2365-2367 
596 |a 9 10 11 23 24 
977 |a o06858124 
901 |a 3755  |c TK1425.S8A23 
901 |a 0104  |c TC425.S9 S68 1979 
098 |a APA 02365 
098 |a APA 02366 
098 |a APA 02367