Hydroelectric power and related purposes, southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report /

"The purpose of this supplemental feasibility study was to reevaluate the economic justification of the proposed upper Susitna River basin hydropower development."--Summary in Main report.

Saved in:
Bibliographic Details
Alternate Title:Southcentral Railbelt area, Alaska, upper Susitna River basin, supplemental feasibility report, hydroelectric power and related purposes
Corporate Contributor(s):United States. Army. Corps of Engineers. Alaska District.
Publisher:U.S. Dept. of the Army, Corps of Engineers, Alaska District,
Report Numbers:APA 2365

APA 2366

APA 2367
Series:Document (Susitna Hydroelectric Project) ; no. 2365-2367.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The purpose of this supplemental feasibility study was to reevaluate the economic justification of the proposed upper Susitna River basin hydropower development."--Summary in Main report.
Physical Description:3 volumes : illustrations, maps (some folded) ; 27 cm
Notes:"February 1979."
Supplement of:Southcentral Railbelt area, Alaska, interim feasibility report, hydroelectric power and related purposes for the upper Susitna River basin. [Anchorage, Alaska? : Alaska District, Corps of Engineers, Dept. of the Army, 1975-1976]
Bibliography:Includes bibliographical references.