Resolution of Alyeska Pipeline Service Company comments on ANGTS pipeline Design criteria manual (DCM)
Alyeska Pipeline Service Company maintains unresolved issues in regards to Northwest Alaskan Pipeline Company's pipeline designs. These issues were transmitted to and discussed with the Office of Federal Inspector (OFI) in 1985. OFI assessed these issues and lists them in this memo separated in...
Saved in:
Main Author: | |
---|---|
Corporate Contributor(s): | Alyeska Pipeline Service Company |
Document Type: | Letter |
Publisher: | Office of the Federal Inspector (OFI) |
Date: | April 16, 1985 |
Addressee / Recipient: | Nelson, George M. |
Sponsor / Funder: | Alyeska Pipeline Service Company |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
LEADER | 04586cmm a22004813 4500 | ||
---|---|---|---|
001 | 2064826 | ||
003 | SIRSI | ||
008 | 141015s1985 000 0 eng u | ||
100 | 1 | |a Rhett, John T., Jr. | |
245 | 1 | 0 | |a Resolution of Alyeska Pipeline Service Company comments on ANGTS pipeline Design criteria manual (DCM) |
260 | |a Office of the Federal Inspector (OFI) | ||
300 | |a 2 p. plus 3 attachments (10 p.) | ||
380 | |a Letter | ||
518 | |a April 16, 1985 | ||
546 | |a English | ||
500 | |a Title from subject line. | ||
500 | |a A memorandum to George M. Nelson (President, Alyeska Pipeline Service Company) from John T. Rhett (Federal Inspector for the Alaska Natural Gas Transportation System) with attachments. | ||
500 | |a One of four pieces of correspondence on regulatory action regarding frost heaves and the Trans-Alaska Pipeline that comprise one special set of related documents. | ||
500 | |a This set of correspondence is archived in Box 1, File 1.a of the document collection for Office of the Federal Inspector for the Alaska Natural Gas Transportation System, housed at National Archives and Records Administration, Washington, D.C. | ||
500 | |a Top of page 1 of this letter (as well as some pages in the attachments) are cut-off in the digital file. | ||
520 | |a Alyeska Pipeline Service Company maintains unresolved issues in regards to Northwest Alaskan Pipeline Company's pipeline designs. These issues were transmitted to and discussed with the Office of Federal Inspector (OFI) in 1985. OFI assessed these issues and lists them in this memo separated into three categories: (1) Alyeska issues that have been resolved, (2) Alyeska issues which should be addressed by NWA and reviewed further, and (3) Alyeska issues which OFI considers invalid within the context of the "Pipeline design criteria manual" (also called "Design criteria manual" or DCM). All these issues deal with frozen soil conditions and frost heaves. | ||
500 | |a The attachments include: (1) a memorandum from Earl Ellis to Rhett dated April 15, 1985 (this April 16 letter describes that memorandum), (2) a letter to J.F. McPhail from Rhett dated December 17, 1981, and (3) a copy from the Federal Register containing two notices from the Office of Federal Inspector for the Alaska Natural Gas Transportation System. The Federal Register excerpt is dated April 22, 1985, but these notices were written by John T. Rhett with the date April 16, 1985. | ||
500 | |a Attachments: Disposition of Alyeska Pipeline Service Company (Alyeska)-Northwest Alaskan Pipeline Company (NWA) final unresolved issues in the Design criteria manual. (A memorandum dated April 15, 2014) -- [Letter to J.F. McPhail from John T. Rhett, December 17, 1981 regarding "TAPS as a design issue and Alyeska's role in the design process"] -- Federal Inspector approval of "Stipulation 1.6.1" Plans for the Alaska segment of the Alaska Natural Gas Transportation System ; Federal Inspector actions concerning the pipeline Design criteria manual for the Alaska segment of the Alaska Natural Gas Transportation System. [Two notices from: Federal register, v. 50, no. 77, p. 15804-15805, April 22, 1985]. | ||
610 | |a Alaska Natural Gas Transportation System | ||
610 | |a Alyeska Pipeline Service Company | ||
610 | |a Northwest Alaskan Pipeline Company | ||
610 | |a Trans-Alaska Pipeline System (TAPS) | ||
653 | |a Frost heave | ||
653 | |a Soil | ||
653 | |a Design and construction | ||
653 | |a Corridors | ||
653 | |a Right-of-way | ||
690 | |a PF-CONS | ||
700 | |a Nelson, George M. | ||
710 | |a Alyeska Pipeline Service Company | ||
740 | 0 | |a Pipeline design criteria manual (Revision 4) | |
740 | 0 | |a Disposition of Alyeska Pipeline Service Company (Alyeska)-Northwest Alaskan Pipeline Company (NWA) final unresolved issues in the Design criteria manual | |
740 | 0 | |a Federal Inspector approval of "Stipulation 1.6.1" Plans for the Alaska segment of the Alaska Natural Gas Transportation System | |
740 | 0 | |a Federal Inspector actions concerning the Pipeline design criteria manual for the Alaska segment of the Alaska Natural Gas Transportation System | |
740 | 0 | |a Federal Register. Volume 50, no. 77. | |
740 | 0 | |a Government design--review submission plan (draft) | |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Letter/Letter_OFI_1981-1985_DesignCriteria.pdf |z PDF contains the set of three pieces of correspondence and one excerpt from the Federal Register. The letter to Nelson appears as the first document in this PDF file, and the attachments follow |
596 | |a 10 |