Alaska Pipeline Project draft resource report 11, safety and reliability

Saved in:
Bibliographic Details
Alternate Title:Report 11, safety and reliability

Safety and reliability
Corporate Author(s): ExxonMobil, TransCanada
Corporate Contributor(s):Federal Energy Regulatory Commission (FERC)
Document Type: Report
Publisher:Alaska Pipeline Project (APP)
Report Numbers:FERC docket no. PF09-11-000

USAG-UR-SGREG-0000005
Date:December 2011
Sponsor / Funder:Federal Energy Regulatory Commission (FERC)
Edition:Draft, Revision 0
Subjects:
Online Access:View Full Text
View Full Text
Library Holdings:Print Versions
LEADER 01513cmm a22003853 4500
001 1493938
003 SIRSI
008 120815s2011 000 0 eng u
088 |a FERC docket no. PF09-11-000 
088 |a USAG-UR-SGREG-0000005 
110 1 |a ExxonMobil 
110 1 |a TransCanada 
245 1 0 |a Alaska Pipeline Project draft resource report 11, safety and reliability 
246 |a Report 11, safety and reliability 
246 |a Safety and reliability 
250 |a Draft, Revision 0 
260 |a Alaska Pipeline Project (APP) 
300 |a 22 p. (in 3 PDF files) 
546 |a English 
518 |a December 2011 
380 |a Report 
505 0 |a Main report -- Appendix 11A. Outline of fire prevention and suppression plan -- Appendix 11B. GTP engineering information (to be filed in the final report). 
653 |a Safety 
653 |a Project plan 
653 |a Facilities 
653 |a Historical summary 
653 |a Gas treatment plants (GTP) 
653 |a Maintenance 
610 |a Alaska Pipeline Project (APP) 
690 |a PF-PROJ 
690 |a PF-HIST 
710 |a Federal Energy Regulatory Commission (FERC) 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_DRR/DraftResourceReport11.pdf  |y First volume of Report 11 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_DRR/index.html  |y Webpage to the list of links to all PDF files for Report 11 and Appendices along with links to all volumes in this set 
596 |a 10