Draft environmental impact statement, Alaska Stand Alone Gas Pipeline. Executive summary
An environmental assessment of the 737-mile ASAP pipeline which Alaska Gasline Development Corporation (AGDC) proposes to build and operate.
Saved in:
Alternate Title: | Alaska Stand Alone Gas Pipeline. Executive summary |
---|---|
Corporate Author: | |
Document Type: | Executive summary |
Publisher: | U.S. Army Corps of Engineers |
Date: | January 2012 |
Bills/Acts; Orders; Treaties: | National Environmental Policy Act (NEPA) |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
LEADER | 01673cmm a22003733 4500 | ||
---|---|---|---|
001 | 1471600 | ||
003 | SIRSI | ||
008 | 121016n2012 000 0 eng u | ||
110 | 1 | |a U.S. Army Corps of Engineers | |
245 | 0 | 0 | |a Draft environmental impact statement, Alaska Stand Alone Gas Pipeline. Executive summary |
246 | |a Alaska Stand Alone Gas Pipeline. Executive summary | ||
260 | |a U.S. Army Corps of Engineers | ||
518 | |a January 2012 | ||
300 | |a 24 p. | ||
380 | |a Executive summary | ||
546 | |a English | ||
500 | |a Additional coordinating agencies: U.S. Coast Guard ; U.S. Department of the Interior, Bureau of Land Management ; U.S. Department of the Interior, National Park Service ; U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration ; U.S. Environmental Protection Agency. | ||
500 | |a Includes project overview and route alternative maps. | ||
520 | |a An environmental assessment of the 737-mile ASAP pipeline which Alaska Gasline Development Corporation (AGDC) proposes to build and operate. | ||
610 | |a Alaska Stand Alone Gas Pipeline (ASAP) | ||
610 | |a Alaska Gasline Development Corporation (AGDC) | ||
653 | |a Environmental impact statements | ||
653 | |a Design and construction | ||
653 | |a Facilities | ||
653 | |a Routing | ||
653 | |a Natural gas liquids (NGL) | ||
653 | |a Project analysis | ||
610 | |a Alaska Pipeline Project (APP) | ||
697 | |a National Environmental Policy Act (NEPA) | ||
690 | |a PF-ENVI | ||
690 | |a PF-PROJ | ||
690 | |a PF-MAP | ||
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report2/Report_USACE1/Report_USACE_2012_DEIS_ASAP_summ.pdf |
596 | |a 10 |