Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report

Saved in:
Bibliographic Details
Main Author: LaBelle, Joseph C.
Corporate Author(s): HARZA-EBASCO Susitna Joint Venture., Alaska Power Authority., Arctic Environmental Information and Data Center (Alaska)
Report Numbers:APA 2330 Draft
Online Access:Link to Full Text
institution ARLIS
collection Susitna Doc Finder
recordtype index
id dbtw2979
upc_str_mv dbtw2979
spelling 2979 December 17, 2015 October 17, 2016 Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report LaBelle, Joseph C. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Arctic Environmental Information and Data Center (Alaska) prepared by Arctic Environmental Information and Data Center (Alaska) for the Alaska Power Authority submitted to Harza-Ebasco Susitna Joint Venture [prepared by Joseph C. LaBelle]. http://www.arlis.org/docs/vol2/hydropower/ November 1984 ii, 47, [26] p. : ill., map ; 28 cm. http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._2330d.pdf APA 2330 Draft APA 02330 Draft
title Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
spellingShingle Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
LaBelle, Joseph C.
APA 2330 Draft
title_short Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
title_full Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
title_fullStr Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
title_full_unstemmed Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
title_auth Assessment of the effects of with-project instream temperatures on Susitna River ice processes in the Devil Canyon to Talkeetna reach : draft report
title_sort assessment of the effects of with-project instream temperatures on susitna river ice processes in the devil canyon to talkeetna reach : draft report
author LaBelle, Joseph C.
author_facet LaBelle, Joseph C.
HARZA-EBASCO Susitna Joint Venture.
Alaska Power Authority.
Arctic Environmental Information and Data Center (Alaska)
author_corporate HARZA-EBASCO Susitna Joint Venture.
Alaska Power Authority.
Arctic Environmental Information and Data Center (Alaska)
physical ii, 47, [26] p. : ill., map ; 28 cm.
callnumber-raw
callnumber-search
callnumber-first
callnumber-subject
reportnumber APA 2330 Draft
reporttype_facet SuHydro
url http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._2330d.pdf
publishDateDisplay November 1984
publishDate 1984
_version_ 1639460644426088448
score 8.091525