Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project : Subtask 4.09 /

"The purpose of this report is to discuss the instrumentation design and operational features of a long-term earthquake monitoring system for the Susitna Project. This discussion incorporates general considerations on seismic instrumentation for dams as applied to the specific seismic and opera...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 4.09, Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project

Subtask 4.09. Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project
Corporate Contributor(s):Woodward-Clyde Consultants.

Acres American Incorporated.

Alaska Power Authority.
Publisher:Woodward-Clyde Consultants,
Report Numbers:APA 1257
Series:Document (Susitna Hydroelectric Project) ; no. 1257.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02777cam a2200505Ia 4500
001 375693
003 SIRSI
005 20120322025634.0
007 cr cn||||a||||
008 030703s1982 xxub bt s000 0 eng d
035 |a (OCoLC)52551999 
040 |a RLA  |c RLA  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 1257 
090 |a TK1425.S8  |b A23 no. 1257 
245 0 0 |a Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project :  |b Subtask 4.09 /  |c prepared by Woodward-Clyde Consultants ; for Acres American Incorporated. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Subtask 4.09,  |p Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project 
246 3 |a Subtask 4.09.  |p Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project 
260 |a [Place of publication not identified] :  |b Woodward-Clyde Consultants,  |c [1982] 
300 |a 30 leaves :  |b map ;  |c 28 cm. 
336 |a text  |2 rdacontent 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
490 1 |a [Document ;  |v no. 1257] 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "June 1982." 
510 3 |a Assigned APA Document no. 1257 in Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a "The purpose of this report is to discuss the instrumentation design and operational features of a long-term earthquake monitoring system for the Susitna Project. This discussion incorporates general considerations on seismic instrumentation for dams as applied to the specific seismic and operational environment of the Susitna Project."--Leaf 1. 
505 0 |a Introduction -- Data requirements -- Network configuration and site selection -- Instrumentation -- Operational responsibilities -- Tables. 
504 |a Includes bibliographical references (leaf 20). 
650 0 |a Hydraulic structures  |x Earthquake effects  |z Alaska  |z Susitna River. 
650 0 |a Reservoir-triggered seismicity  |z Alaska  |z Susitna River Valley. 
650 0 |a Earthquake hazard analysis  |z Alaska  |z Susitna River Valley. 
650 0 |a Seismological stations  |z Alaska  |z Susitna River Valley. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
710 2 |a Woodward-Clyde Consultants. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1257. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1257.pdf  |z ARLIS Document Server 
901 |a 3755  |c TK1425.S8A23 no.1257  |f orig 
596 |a 9 10 
098 |a APA 01257