Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project : Subtask 4.09 /
"The purpose of this report is to discuss the instrumentation design and operational features of a long-term earthquake monitoring system for the Susitna Project. This discussion incorporates general considerations on seismic instrumentation for dams as applied to the specific seismic and opera...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 4.09, Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project Subtask 4.09. Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project |
---|---|
Corporate Contributor(s): | Woodward-Clyde Consultants. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Woodward-Clyde Consultants, |
Report Numbers: | APA 1257 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1257. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02777cam a2200505Ia 4500 | ||
---|---|---|---|
001 | 375693 | ||
003 | SIRSI | ||
005 | 20120322025634.0 | ||
007 | cr cn||||a|||| | ||
008 | 030703s1982 xxub bt s000 0 eng d | ||
035 | |a (OCoLC)52551999 | ||
040 | |a RLA |c RLA |d OCLCQ |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 1257 | ||
090 | |a TK1425.S8 |b A23 no. 1257 | ||
245 | 0 | 0 | |a Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project : |b Subtask 4.09 / |c prepared by Woodward-Clyde Consultants ; for Acres American Incorporated. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Subtask 4.09, |p Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project | |
246 | 3 | |a Subtask 4.09. |p Design manual for the long-term earthquake monitoring system for the Susitna Hydroelectric Project | |
260 | |a [Place of publication not identified] : |b Woodward-Clyde Consultants, |c [1982] | ||
300 | |a 30 leaves : |b map ; |c 28 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a computer |2 rdamedia | ||
338 | |a online resource |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 1257] | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "June 1982." | ||
510 | 3 | |a Assigned APA Document no. 1257 in Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a "The purpose of this report is to discuss the instrumentation design and operational features of a long-term earthquake monitoring system for the Susitna Project. This discussion incorporates general considerations on seismic instrumentation for dams as applied to the specific seismic and operational environment of the Susitna Project."--Leaf 1. | ||
505 | 0 | |a Introduction -- Data requirements -- Network configuration and site selection -- Instrumentation -- Operational responsibilities -- Tables. | |
504 | |a Includes bibliographical references (leaf 20). | ||
650 | 0 | |a Hydraulic structures |x Earthquake effects |z Alaska |z Susitna River. | |
650 | 0 | |a Reservoir-triggered seismicity |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Earthquake hazard analysis |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Seismological stations |z Alaska |z Susitna River Valley. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
710 | 2 | |a Woodward-Clyde Consultants. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1257. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1257.pdf |z ARLIS Document Server |
901 | |a 3755 |c TK1425.S8A23 no.1257 |f orig | ||
596 | |a 9 10 | ||
098 | |a APA 01257 |