Instreamflow relationships report. Volume no. 1 /

Saved in:
Bibliographic Details
Alternate Title:Instream flow relationships report. Volume no. 1. Preliminary draft.

Alaska Power Authority, Susitna Hydroelectric Project. Instreamflow relationships report. Volume no. 1

Settlement process, instream flow relationships report, volume no. 1.
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

E. Woody Trihey and Associates.

United States. Federal Energy Regulatory Commission.

Woodward-Clyde Consultants.
Publisher:Alaska Power Authority,
Report Numbers:APA 3060 (draft 1)

SUS 437
Original Source:Revised as: Settlement process, instream flow relationships report, volume no. 1.
Edition:Prelimimary draft.
Series:Document (Susitna Hydroelectric Project) ; no. 3060d1.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03366cam a2200589Ia 4500
001 375315
003 SIRSI
005 20160729143048.0
007 ta
007 he bmu---bbca
007 cr bn||a||||||
008 030708e198412 akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA  |d OCLCA  |d OCLCF  |d OCL  |d OCLCQ  |d RLA 
035 |a (OCoLC)52571182 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S9 no. 437 
088 |a APA 3060 (draft 1) 
088 |a SUS 437 
130 0 |a Instream flow relationships report.  |n Volume no. 1.  |s Preliminary draft. 
245 1 0 |a Instreamflow relationships report.  |n Volume no. 1 /  |c prepared for Harza-Ebasco Susitna Joint Venture ; prepared by E. Woody Trihey and Associates and Woodward-Clyde Consultants. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Instreamflow relationships report.  |n Volume no. 1 
250 |a Prelimimary draft. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a 215 pages in various pagings :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "December 1984." 
500 |a "Federal Energy Regulatory Commission, Project No. 7114." 
500 |a Volumes 1 and 2 of this set serve as a summary to the series: Instream flow relationships report series, technical report. 
510 3 |a The final version of this report is assigned APA Document no. 3060 in the Susitna Hydroelectric Project document index. Alaska Resources Library and Information Services has assigned number APA 3060d1 (or "APA 3060 (draft 1)") to this draft version for the Susitna Hydroelectric Project collection. 
510 3 |a Assigned number SUS 437 in the Susitna Aquatic Impact Assessment Project bibliography. 
500 |a This volume was revised as: Settlement process, instream flow relationships report, volume no. 1. -- Working draft. (Numbered SUS 455). 
530 |a Available also in microfiche format and electronic format on the Internet. 
505 0 |a Introduction -- Aquatic habitat modeling -- Fish resources and habitat types -- Watershed characteristics and physical processes influencing middle river habitats -- Influence of streamflow and instream hydraulics on middle Susitna River habitats -- Integration of results and discussion. 
504 |a Includes bibliographical references (pages VII-1-VII-8). 
650 0 |a Instream flow  |z Alaska  |z Susitna River. 
650 0 |a Stream measurements  |z Alaska  |z Susitna River. 
650 0 |a Fishes  |x Habitat  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project  |x Environmental aspects. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a E. Woody Trihey and Associates. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Woodward-Clyde Consultants. 
730 0 |i Revised as:  |a Settlement process, instream flow relationships report, volume no. 1. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3060d1. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/4/SUS437.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a SUS 00437 
098 |a APA 03060 (draft 1)