Stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station for Watana and Devil Canyon in 2002 and 2020 : report /
Saved in:
Physical Description: | 566 p. in various pagings : ill. ; 28 cm. |
---|---|
Notes: | Chiefly tables and graphs. At head of title: Susitna Hydroelectric Project. "February 1985." "Susitna File No. 6.18.7.5." "Volume 4, appendix F." Volume 4 (appendix F) is part of a multi-volume set of seven reports differently titled and numbered 2600-2606 in the Document series. "Federal Energy Regulatory Commission project no. 7114"--Cover. |
Report Type: | Final report. |