Freshwater & terrestrial habitat studies.
This study was conducted to collect baseline data for environmental analysis of the proposed Knik Arm Crossing Project. North approach highway corridors, connecting the crossing itself with the Parks Highway, would traverse areas of relatively undisturbed terrain including numerous streams. Since th...
Saved in:
Alternate Title: | Freshwater and terrestrial habitat studies Knik Arm Crossing, freshwater & terrestrial habitat studies |
---|---|
Corporate Contributor(s): | Alaska. Department of Transportation and Public Facilities. Dames & Moore. EMPS-Sverdrup. De Leuw, Cather & Company. Tryck, Nyman and Hayes. United States. Federal Highway Administration. |
Publisher: | U.S. Department of Transportation, Federal Highway Administration ; Alaska Department of Transportation and Public Facilities, |
Report Numbers: | APA 2709 |
Series: | Technical memorandum (Knik Arm Crossing Project) ;
no. 16. Document (Susitna Hydroelectric Project) ; no. 2709. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03485cam a2200613Ia 4500 | ||
---|---|---|---|
001 | 345165 | ||
003 | SIRSI | ||
005 | 20150723145050.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 890210s1984 akubf bt f000 0 eng d | ||
040 | |a UDA |b eng |c UDA |d OCL |d OCLCQ |d OCLCO |d OCLCF |d RLA | ||
035 | |a (OCoLC)19168583 | ||
043 | |a n-us-ak | ||
050 | 4 | |a HE353.A4 |b K657 1984 | |
050 | 4 | |a TK1425.S8 |b A23 no. 2709 | |
050 | 4 | |a TG25.K58 |b F74 1984 | |
088 | |a APA 2709 | ||
245 | 0 | 0 | |a Freshwater & terrestrial habitat studies. |
246 | 3 | |a Freshwater and terrestrial habitat studies | |
246 | 3 | |a Knik Arm Crossing, freshwater & terrestrial habitat studies | |
260 | |a [Washington, D.C.?] : |b U.S. Department of Transportation, Federal Highway Administration ; |a [Alaska] : |b Alaska Department of Transportation and Public Facilities, |c [1984] | ||
300 | |a 81 p. in various pagings : |b 2 maps ; |c 28 cm. + |e 1 map (blueline ; 84 x 75 cm.). | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Technical memorandum ; |v no. 16 | |
500 | |a At head of title: Knik Arm Crossing. | ||
500 | |a "A Report Prepared by Dames and Moore for EMPS-Sverdrup ; principal associates, De Leuw, Cather & Company [and] Tryck, Nyman & Hayes"--Page [2] of cover. | ||
500 | |a "January 27, 1984." | ||
500 | |a There are three maps in this report: one on a regular page (page [I-3]), one on a folded leaf (page [I-10]), and the blueline map on an accompanying sheet in the back pocket. | ||
510 | 3 | |a Assigned APA Document no. 2709 in Susitna Hydroelectric Project document index. This report was used as supporting documentation in research by the Susitna Hydroelectric Project. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This study was conducted to collect baseline data for environmental analysis of the proposed Knik Arm Crossing Project. North approach highway corridors, connecting the crossing itself with the Parks Highway, would traverse areas of relatively undisturbed terrain including numerous streams. Since the biological and physical characteristics of most of these streams are not well know, the purpose of this study was to fill specific information gaps on those freshwater habitats. Terrestrial habitat mapping of this area was conducted. | ||
504 | |a Includes bibliographical references (pages I-22 and II-6). | ||
650 | 0 | |a Freshwater habitats |z Alaska |z Knik Arm Watershed. | |
650 | 0 | |a Ecological mapping |z Alaska |z Knik Arm Watershed. | |
650 | 0 | |a River surveys |z Alaska |z Knik Arm Watershed. | |
650 | 0 | |a Bridges |x Environmental aspects |z Alaska |z Knik Arm. | |
650 | 0 | |a Roads |x Environmental aspects |z Alaska |z Knik Arm Watershed. | |
610 | 2 | 0 | |a Knik Arm Crossing Project. |
650 | 7 | |a Bridges |x Environmental aspects. |2 fast |0 (OCoLC)fst00838718 | |
710 | 1 | |a Alaska. |b Department of Transportation and Public Facilities. | |
710 | 2 | |a Dames & Moore. | |
710 | 2 | |a EMPS-Sverdrup. | |
710 | 2 | |a De Leuw, Cather & Company. | |
710 | 2 | |a Tryck, Nyman and Hayes. | |
710 | 1 | |a United States. |b Federal Highway Administration. | |
830 | 0 | |a Technical memorandum (Knik Arm Crossing Project) ; |v no. 16. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2709. |5 AkARLIS | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/27/APA2709.pdf |z ARLIS Document Server |
090 | |a HE356.A4 |b K55 no. 16 | ||
596 | |a 9 10 | ||
098 | |a APA 02709 |