Comments on Revised Study Plan for Susitna-Watana Hydroelectric Project, FERC Project No. 14241.

This document is the response from the Alaska Department of Environmental Conservation and the Alaska Department of Fish and Game regarding the Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project (FERC No. 14241). The ISR is required by the Federal Energy Regulatory Comm...

Full description

Saved in:
Bibliographic Details
Alternate Title:Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP).

Initial Study Report.
Corporate Author: Alaska. Department of Natural Resources. Office of Project Management and Permitting,
Additional Author(s):Crafford, Thomas C.

Bose, Kimberly D.,
Corporate Contributor(s):Alaska. Department of Environmental Conservation,

Alaska. Department of Fish and Game

United States. Federal Energy Regulatory Commission,
Report Numbers:SuWa 296
Original Source:Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP). Draft.

Evaluation of: Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 296.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 04674ctm a2200625Ia 4500
001 2963730
003 SIRSI
005 20170331145853.0
007 ta
007 cr cn||a||||||
008 170331s2016 akuab bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)980360572 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 296 
088 |a SuWa 296 
098 |a SuWa 00296 
110 1 |a Alaska.  |b Department of Natural Resources.  |b Office of Project Management and Permitting,  |e compiler. 
245 1 0 |a Comments on Revised Study Plan for Susitna-Watana Hydroelectric Project, FERC Project No. 14241. 
260 |c 2013 January 17. 
300 |a 68 pages in various pagings :  |b illustrations (chiefly col.), color maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 296 
500 |a Title from subject line in cover letter. 
500 |a Letterhead: State of Alaska, Department of Natural Resources, Office of Project Management and Permitting, Anchorage, Alaska. 
500 |a ARLIS assigned report number: SuWa 296. 
500 |a This document is a letter with attachments sent on January 17, 2013, to Kimberly D. Bose, Secretary of the Federal Energy Regulatory Commission (FERC), from Tom Crafford, Director of Office of Project Management and Permitting, as a consolidated comment from two Alaska resource agencies on the Initial Study Report (comprising sixty volumes published in 2014 and 2015). 
580 |a An evaluation of: Initial Study Report. -- [Anchorage] : [Alaska Energy Authority], [2014-2015] -- June 2014 (but Part D sections and the overview are dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223). 
500 |a Attachment 2 has its own title page with title: Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP). -- Draft, Rev. 0. -- Alaska Department of Environmental Conservation, Division of Water, June 2012. 
530 |a Available also in electronic format on the Internet. 
520 |a This document is the response from the Alaska Department of Environmental Conservation and the Alaska Department of Fish and Game regarding the Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project (FERC No. 14241). The ISR is required by the Federal Energy Regulatory Commission for the licensing of the proposed project. This document comprises a 2-page cover letter accompanied by comments from the two agencies (14 pages) and two attachments (52 pages). The document was sent by the Alaska Office of Project Management and Permitting along with a cover letter written by that Office, whose role is to facilitate interagency coordination development projects in the state during the permitting processes. 
505 0 |a [Cover letter] -- Alaska Department of Environmental Conservation [comments] -- Alaska Department of Fish and Game [comments] -- Attachment 1. ADEC Water Quality Monitoring Quality Assurance Project Plan (QAPP) review checklist for Susitna Hydro Project Baseline WQ Monitoring Sampling and Analysis Plan QAPP -- Attachment 2. ADEC draft guidance for a Tier 2 Water Quality Monitoring QAPP, Rev. 0. 
504 |a Includes bibliographical references. 
630 0 0 |a Initial Study Report. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Ecological risk assessment  |z Alaska  |z Susitna River. 
650 0 |a Water quality  |x Research  |z Alaska  |z Susitna River  |x Methodology. 
650 0 |a Water  |z Alaska  |z Susitna River  |x Analysis. 
650 0 |a Quality assurance  |x Methodology. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Environmental aspects. 
700 1 |a Crafford, Thomas C.  |q (Thomas Carter)  |e compiler. 
700 1 |a Bose, Kimberly D.,  |e addressee. 
710 1 |a Alaska.  |b Department of Environmental Conservation,  |e author. 
710 1 |a Alaska.  |b Department of Fish and Game  |e author. 
710 1 |a United States.  |b Federal Energy Regulatory Commission,  |e addressee. 
730 0 2 |a Guidance document for writing a Tier 2 Water Quality Monitoring Quality Assurance Project Plan (QAPP).  |s Draft. 
730 0 |i Evaluation of:  |a Initial Study Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 296. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa296.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201703 
596 |a 9 10