Air quality study, Study plan Section 15.9, Study Completion Report /

An air quality analysis is being performed for approval by the Federal Energy Regulatory Commission for the Susitna-Watana Hydroelectric Project in Alaska. The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and...

Full description

Saved in:
Bibliographic Details
Alternate Title:Study Completion Report. Air quality study (15.9)

Air quality study, Study plan Section 15.9, Initial Study Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

Harris, Miller, Miller & Hanson Inc.,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Air quality study, Study plan Section 15.9, Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:An air quality analysis is being performed for approval by the Federal Energy Regulatory Commission for the Susitna-Watana Hydroelectric Project in Alaska. The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the greater Railbelt region. This document contains a comprehensive discussion of the air quality study from its beginning in 2012 through its completion in 2015, and it explains how all study objectives have been met.
Physical Description:v, 32 page : 5 color maps, 1 color chart ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

"October 2015."

ARLIS assigned report number: SuWa 289.
Report Type:November 2015; Study Completion and 2014/2015 Implementation Reports.
Original Source:Preceded by (expression): Air quality study, Study plan Section 15.9, Initial Study Report.
Bibliography:Includes bibliographical references (pages 18-19).
Related Items:Preceded by: Air quality study, Study plan Section 15.9, Initial Study Report / prepared by HMMH. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223).