Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum addendum /

This document contains three maps showing monitoring sites and instream flow focus areas in the Susitna River and its sloughs. These were locations for water quality monitoring, water level monitoring, and fish sampling during the 2013/2014 winter field season as part of the planning of the Susitna-...

Full description

Saved in:
Bibliographic Details
Alternate Title:2013-2014 instream flow winter studies, technical memorandum addendum

Technical memorandum addendum, 2013-2014 instream flow winter studies
Corporate Author: R2 Resource Consultants,
Additional Author(s):Zablotney, Joetta,
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 272
Series:Susitna-Watana Hydroelectric Project document ; no. 272.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document contains three maps showing monitoring sites and instream flow focus areas in the Susitna River and its sloughs. These were locations for water quality monitoring, water level monitoring, and fish sampling during the 2013/2014 winter field season as part of the planning of the Susitna-Watana Hydroelectric Project. The maps cover three areas: Wiskers Slough (north of Talkeetna between river miles 104.5 and 107), Skull Creek and Slough 8A (between river miles 128 and 131), and Gold Creek (between river miles 138 and 140.5).
Physical Description:1 atlas (4 p.) : 3 col. maps ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"December 2014."

"Alaska Energy Authority ; Map author: R2 - Joetta Zablotney"--Map legends.

ARLIS assigned report number: SuWa 272.

This document is an errata document intended to replace pages 38-40 (containing figures 2-4) of: Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum (SuWa 236), which is Attachment H to SuWa 228. However, those replacement pages are numbered 2-4 to suit this addendum rather than the document containing the corresponding pages.
Report Type:December 2014 technical memoranda.

Technical memorandum.
Related Titles:Replacement in part of (expression): Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 236 SuWa 236 Pages 38-40 only of SuWa 236 are replaced by document SuWa 272.
Geographic Coordinates:Scale [ca. 1:12,000] (W 150°15ʹ--W 149°37ʹ/N 62°47ʹ--N 62°20ʹ).