Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work /
"This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work Power studies. Subtask 1.01, Closeout report. Review of ISER work Subtask 1.01. Closeout report. Review of ISER work Closeout report. Review of ISER work Review of ISER work |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Acres American Inc., |
Report Numbers: | APA 1201 SUS 29 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1201. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt and addresses specific issues related to the methodology."--P. 1-1. |
---|---|
Physical Description: | 282 p. in various pagings : ill. ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "December, 1980." |
Bibliography: | Includes bibliographical references. |