Task 7, Environmental studies. Draft wildlife mitigation option paper /
"Presented are approaches to mitigate impacts predicted to occur if the Susitna hydroelectric project is constructed. This paper does not, however, reflect decisions made prior to this study--the location of such project facilities as the access road, for example--that have a mitigative effect....
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Task 7, Environmental studies. Draft wildlife mitigation option paper Environmental studies. Draft wildlife mitigation option paper Draft wildlife mitigation option paper Draft analysis of wildlife mitigation options. |
---|---|
Additional Author(s): | Reed, Edward T. |
Corporate Contributor(s): | Alaska Power Authority. Susitna Hydroelectric Project. Terrestrial Environmental Specialists. Acres American Incorporated. |
Publisher: | [Alaska Power Authority], |
Report Numbers: | APA 4036 |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Draft analysis of wildlife mitigation options /
- Edward T. Reed.