Susitna Project investigation memorandum, Task 40 - need for power /
This document describes a 'Need for power update study' to be carried out. The purpose of that study is to update the electric power and energy demand of the Alaska Railbelt region and to review the technical feasibility, economic attractiveness, and financial soundess of the Susitna Hydro...
Saved in:
Alternate Title: | Task 40 - need for power |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | APA 2404 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2404. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This document describes a 'Need for power update study' to be carried out. The purpose of that study is to update the electric power and energy demand of the Alaska Railbelt region and to review the technical feasibility, economic attractiveness, and financial soundess of the Susitna Hydroelectric Project. |
---|---|
Physical Description: | 36 p. ; 28 cm. |
Notes: | "March 11, 1983." Statement of responsibility written by hand. Series statement from label on cover. |
Bibliography: | Includes bibliographical references (p. 34). |