Task 40, need for power study, capital cost estimates, estimate no. APA 1707M-1.
Saved in:
Alternate Title: | Need for power study, capital cost estimates, estimate no. APA 1707M-1 Alaska Power Authority, Susitna Hydroelectric Project, Project No. 7114-00. Task 40, need for power study, capital cost estimates, estimate no. APA 1707M-1 Need for power study, capital cost estimates, Number APA-1707-M1 Alaska Power Authority, Susitna Hydroelectric Project. Need for power study, capital cost estimates, Number APA-1707-M1 |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | APA 2697 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2697. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- 77 MW simple cycle gas turbine plant, Kenai site
- 77 MW simple cycle gas turbine plant extension, Kenai site
- 220 MW combine cycle gas turbine plant, Kenai site
- 200 MW coal fired plant at Nenana
- 200 MW coal fired plant extension at Nenana
- 200 MW coal fired plant at Beluga
- 200 MW coal fired plant extension at Beluga
- 400 MW coal fired plant at Beluga
- 600 MW coal fired plant at Beluga.