Unit prices - backup calculations, Watana Dam, unit cost summary sheets : unit cost summary, revisions to rock exc. unit costs, production rates, copy of printout, standard sheets.

Saved in:
Bibliographic Details
Alternate Title:Book A. Unit prices - backup calculations, Watana Dam, unit cost summary sheets.

(A). Unit prices - backup calculations, Watana Dam, unit cost summary sheets : unit cost summary, revisions to rock exc. unit costs, production rates, copy of printout, standard sheets

Title in the Susitna Hydroelectric Project document index: Book A. Unit price - backup calculations, Watana Dam unit cost summary sheet
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 97
Series:Document (Susitna Hydroelectric Project) ; no. 97.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:104 [i.e. 94] p. ; 28 cm.
Notes:Handwritten calculation sheets and printed cost estimate tables.

At head of title: (A).

This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc.

Series statement from label on cover.

Pages are numbered by hand up to 104, but some pages 5, 53, 74, 95-96, and 99-103 are not included.