User's manual, Optimized generation planning program, OGP-6 and OGP-6A (proprietary) /

This manual describes a computer program offered to electric utilities to assist planners in analyzying alternative patterns of generation additions--Optimized generation planning (OGP). OGP has the capability to perform system reliability, investment costing, and production costing calculations.

Saved in:
Bibliographic Details
Corporate Contributor(s):General Electric Company. Electric Utility Systems Engineering Department.

HARZA-EBASCO Susitna Joint Venture
Publisher:Electric Utility Systems Engineering Department, General Electric Company,
Report Numbers:APA 2516
Series:Document (Susitna Hydroelectric Project) ; no. 2516.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02180cam a2200409Ia 4500
001 2018500
003 SIRSI
005 20140214095607.0
007 ta
007 cr bn||||a||||
008 140214s1983 nyu 000 0 eng d
035 |a (OCoLC)870537169 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 2516 
088 |a APA 2516 
245 0 0 |a User's manual, Optimized generation planning program, OGP-6 and OGP-6A (proprietary) /  |c Generation Planning and Economics, Electric Utility Systems Engineering Department, General Electric Company. 
260 |a Schenectady, N.Y. :  |b Electric Utility Systems Engineering Department, General Electric Company,  |c [1983] 
300 |a 342 p. in various pagings ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "July, 1983"--Cover. 
510 3 |a Assigned APA Document no. 2516 in the Susitna Hydroelectric Project document index. This manual was used as supporting documentation in research by the Susitna Hydroelectric Project. Series statement on label on cover of those copies: HARZA-EBASCO Susitna Joint Venture document ; no. 2516. 
530 |a Available also in electronic format on the Internet. 
520 |a This manual describes a computer program offered to electric utilities to assist planners in analyzying alternative patterns of generation additions--Optimized generation planning (OGP). OGP has the capability to perform system reliability, investment costing, and production costing calculations. 
630 0 0 |a Optimized generation planning (Computer file) 
650 0 |a Electric power production  |x Computer programs. 
650 0 |a Electric power production  |x Costs  |x Computer programs. 
710 2 |a General Electric Company.  |b Electric Utility Systems Engineering Department. 
710 2 |a HARZA-EBASCO Susitna Joint Venture  |5 AkARLIS. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2516.  |5 AkARLIS. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/25/APA2516.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 02516