Backup Book E, Devil Canyon - concrete costs.
A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the planned arch Devil Canyon Dam, part of the Susitna Hydroelectric Project.
Saved in:
Alternate Title: | Book E. Backup Book E, Devil Canyon - concrete costs. Title entered in the Susitna Hydroelectric Project document index as: Devil Canyon concrete works, Book E, Task 9 - Group 12 Title on label on binder cover (difficult to read due to poor reproduction): Task 9 - Group 12, Book E, Devil Canyon concrete works Caption title on page 1 (table of contents page): Unit prices - backup calculations, Devil Canyon, concrete works (E). Unit prices - backup calculations, Devil Canyon, concrete works |
---|---|
Corporate Contributor(s): | Acres American Incorporated. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 255 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 255. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03710cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 1991706 | ||
003 | SIRSI | ||
005 | 20140523011043.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140102s1982 nyu t 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)867056859 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 255 | |
088 | |a APA 255 | ||
049 | |a RLAA | ||
130 | 0 | |a Book E. |p Backup Book E, Devil Canyon - concrete costs. | |
245 | 1 | 0 | |a Backup Book E, Devil Canyon - concrete costs. |
246 | 1 | |i Title entered in the Susitna Hydroelectric Project document index as: |a Devil Canyon concrete works, Book E, Task 9 - Group 12 | |
246 | 1 | |i Title on label on binder cover (difficult to read due to poor reproduction): |a Task 9 - Group 12, Book E, Devil Canyon concrete works | |
246 | 1 | |i Caption title on page 1 (table of contents page): |a Unit prices - backup calculations, Devil Canyon, concrete works | |
246 | 3 | |a (E). |p Unit prices - backup calculations, Devil Canyon, concrete works | |
260 | |a [Buffalo, N.Y.? : |b Acres American Incorporated, |c 1982] | ||
300 | |a p. 11-13, 173 p. [i.e. 152 p.] ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 255 | |
500 | |a Title from label on what appears to be the title page from a poor reproduction. Series statement from label on cover and title page. | ||
500 | |a At head of caption title on page 1: (E). | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Paging is handwritten up to 173. Cataloging is based on copy lacking pages for some page numbers. The two memorandums (numbered page 11-13) precede page 1. Total number of pages is 152. | ||
510 | 3 | |a Assigned APA Document no. 255 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
500 | |a Includes two Acres office memorandums to Dave H. MacDonald and others from James R. Plummer dated January 16 and 20, 1982. | ||
520 | |a A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the planned arch Devil Canyon Dam, part of the Susitna Hydroelectric Project. | ||
505 | 0 | |a Summary -- Structures -- Summary -- Powerhouse -- Transformer gallery -- Auxiliary spillway -- Emergency spillway -- Surge chamber -- Intake -- Bus tunnels & shafts -- Summary -- Division tunnel -- Tailrace tunnel -- Main access tunnel -- Grout galleries -- Cable shaft -- Access shaft -- Penstocks -- Forming crews -- Placing crews -- Supply of concrete -- Concrete production -- Cement -- Coarse aggregate -- Fine aggregate -- Supply & install rebar. | |
610 | 2 | 0 | |a Devil Canyon Project |x Planning. |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Concrete |x Costs. | |
650 | 0 | |a Arch dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 255. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/2/APA255.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00255 |