Design transmittal. Subtasks 6.02, 6.03, 6.06, Preliminary design considerations.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Design transmittal. Subtasks 6.02, 6.03, 6.06, Preliminary design considerations Subtasks 6.02, 6.03, 6.06, Preliminary design considerations Preliminary design considerations |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Susitna Hydroelectric Project. Acres American Incorporated. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1278 APA 1285 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1278. Document (Susitna Hydroelectric Project) ; no. 1285. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 01972cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 1991294 | ||
003 | SIRSI | ||
005 | 20131220115332.0 | ||
007 | cr bn||||a|||| | ||
008 | 131220s1981 nyua t 000 0 eng d | ||
035 | |a (OCoLC)865786546 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1278 | |
088 | |a APA 1278 | ||
088 | |a APA 1285 | ||
245 | 0 | 0 | |a Design transmittal. |n Subtasks 6.02, 6.03, 6.06, |p Preliminary design considerations. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Design transmittal. |n Subtasks 6.02, 6.03, 6.06, |p Preliminary design considerations | |
246 | 3 | 0 | |a Subtasks 6.02, 6.03, 6.06, |p Preliminary design considerations |
246 | 3 | 0 | |a Preliminary design considerations |
260 | |a Buffalo, N.Y. : |b Acres American Incorporated, |c [1981] | ||
300 | |a [26] p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "February 1981." | ||
510 | 3 | |a Assigned APA Document no. 1278 in the Susitna Hydroelectric Project document index. Also assigned no. 1285 (duplicate entry). | |
530 | |a Available also in electronic format on the Internet. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Acres American Incorporated. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1278. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1285. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1278.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01278 | ||
098 | |a APA 01285 |