Environmental studies procedures manual. Subtask 7.05, Socioeconomic analysis /
This procedure manual describes the research methodology for conducting a two-phase socioeconomic analysis to evaluate the effects of the construction and operation of the proposed Susitna Hydroelectric Project within the state of Alaska.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies procedures manual. Subtask 7.05, Socioeconomic analysis Subtask 7.05, Socioeconomic analysis Socioeconomic analysis |
---|---|
Corporate Contributor(s): | Terrestrial Environmental Specialists. Frank Orth & Associates. Acres American Incorporated. Susitna Hydroelectric Project. Alaska Power Authority. |
Publisher: | Terrestrial Environmental Specialists Inc., |
Report Numbers: | SUS 328 |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02469nam a2200505Ia 4500 | ||
---|---|---|---|
001 | 1980689 | ||
003 | SIRSI | ||
005 | 20140320012915.0 | ||
007 | cr bn||||a|||| | ||
008 | 131023s1980 nyua t 000 0 eng d | ||
035 | |a (OCoLC)861288933 | ||
040 | |a RLA |c RLA |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S9 no. 328 | |
088 | |a SUS 328 | ||
245 | 0 | 0 | |a Environmental studies procedures manual. |n Subtask 7.05, |p Socioeconomic analysis / |c submitted by Terrestrial Environmental Specialists, Inc. and Frank Orth & Associates, Inc. to Acres American, Inc. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Environmental studies procedures manual. |n Subtask 7.05, |p Socioeconomic analysis | |
246 | 3 | 0 | |a Subtask 7.05, Socioeconomic analysis |
246 | 3 | 0 | |a Socioeconomic analysis |
260 | |a [Phoenix, N.Y.] : |b Terrestrial Environmental Specialists Inc., |c [1980] | ||
300 | |a iii, 31 p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "June 1980." | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
510 | 3 | |a Assigned number SUS 328 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This procedure manual describes the research methodology for conducting a two-phase socioeconomic analysis to evaluate the effects of the construction and operation of the proposed Susitna Hydroelectric Project within the state of Alaska. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Research |x Methodology. |
650 | 0 | |a Hydroelectric power plants |x Economic aspects |x Research |z Alaska |x Methodology. | |
650 | 0 | |a Hydroelectric power plants |x Social aspects |x Research |z Alaska |x Methodology. | |
650 | 0 | |a Dams |x Economic aspects |x Research |z Alaska |x Methodology. | |
650 | 0 | |a Dams |x Social aspects |x Research |z Alaska |x Methodology. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Research |x Methodology. | |
710 | 2 | |a Terrestrial Environmental Specialists. | |
710 | 2 | |a Frank Orth & Associates. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/SUS/3/SUS328.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SUS 00328 |