Revised study plan determination schedule.
A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the S...
Saved in:
Alternate Title: | Reference: Revised study plan determination schedule |
---|---|
Main Author: | |
Additional Author(s): | Dyok, Wayne, |
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Office of Energy Projects. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Report Numbers: | SuWa 86 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 86. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana Hydroelectric Project. |
---|---|
Physical Description: | 4 p. ; 28 cm. |
Notes: | Title from caption. At head of title: "Reference:". "Project No. 14241-000 - Alaska, Susitna-Watana Hydroelectric Project, Alaska Energy Authority." "December 31, 2012." ARLIS assigned report number: SuWa 86. |
Report Type: | Correspondence. |
Related Titles: | Alaska Energy Authority. Revised study plan. [Anchorage : Alaska Energy Authority, 2012] This letter has a response: Fisher-Goad, Sara. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000. 2013 January 7 Susitna-Watana Hydroelectric Project document ; no. 87 SuWa 87 |