Revised study plan determination schedule.

A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the S...

Full description

Saved in:
Bibliographic Details
Alternate Title:Reference: Revised study plan determination schedule
Main Author: Wright, Jeff C.,
Additional Author(s):Dyok, Wayne,
Corporate Contributor(s):United States. Federal Energy Regulatory Commission. Office of Energy Projects.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Report Numbers:SuWa 86
Series:Susitna-Watana Hydroelectric Project document ; no. 86.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana Hydroelectric Project.
Physical Description:4 p. ; 28 cm.
Notes:Title from caption.

At head of title: "Reference:".

"Project No. 14241-000 - Alaska, Susitna-Watana Hydroelectric Project, Alaska Energy Authority."

"December 31, 2012."

ARLIS assigned report number: SuWa 86.
Report Type:Correspondence.
Related Titles:Alaska Energy Authority. Revised study plan. [Anchorage : Alaska Energy Authority, 2012]

This letter has a response: Fisher-Goad, Sara. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000. 2013 January 7 Susitna-Watana Hydroelectric Project document ; no. 87 SuWa 87