Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000.

This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) regarding the Revised Study Plan for the referenced Project filed by AEA on December 14, 2012. The December 31 letter states that 13 of the 58 study plan...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on Project's Document webpage: AEA response to FERC RSP Letter 1.7.13
Main Author: Fisher-Goad, Sara,
Additional Author(s):Bose, Kimberly D.,
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

United States. Federal Energy Regulatory Commission.

Alaska Energy Authority.
Report Numbers:SuWa 87
Series:Susitna-Watana Hydroelectric Project document ; no. 87.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) regarding the Revised Study Plan for the referenced Project filed by AEA on December 14, 2012. The December 31 letter states that 13 of the 58 study plans lack sufficient detail for the Commission to make a study plan determination. The Staff's letter appears to be based on concerns with the Revised Study Plan identified in a letter filed by the National Marine Fisheries Service dated January 2, 2013. Alaska Energy Authority disagrees with this characterization and addresses each of the matters raised by Staff's December 31 letter in this document.
Physical Description:9, [161] p. : col. maps, col. charts ; 28 cm.
Notes:Title from caption.

This document consists of a letter to Kimberly D. Bose, Secretary, Secretary, Federal Energy Regulatory Commission, from Sara Fisher-Goad, Executive Director, Alaska Energy Authority, accompanied by several attachments originating primarily from the Revised Study Plan.

"January 7, 2013."

ARLIS assigned report number: SuWa 87.
Report Type:Correspondence.
Related Titles:Alaska Energy Authority. Revised study plan. [Anchorage : Alaska Energy Authority, 2012]

Reply to: Wright, Jeff C. Revised study plan determination schedule. 2012 December 31 Susitna-Watana Hydroelectric Project document ; no. 86 SuWa 86

This letter has a response: Wright, Jeff C. Revised study plan determination schedule. 2013 January 17 Susitna-Watana Hydroelectric Project document ; no. 88 SuWa 88
Bibliography:Includes bibliographical references.