Reports, findings and recommendations /
This document contains a series of reports and comments of the Alaska Power Authority's External Review Panel on the Susitna Hydroelectric Project based on their review of the comprehensive Feasibility Report prepared by Acres American, Inc. Reports are dated from January 1981 to April 1982. In...
Saved in:
Alternate Title: | Title of APA 2954 in the in Susitna Hydroelectric Project document index: Reports, findings and recommendations, APA External Review Panal [sic] Title of APA 2955 in the in Susitna Hydroelectric Project document index: Reports, findings and recommendations, APA External Review Panal [sic] Meeting #6 |
---|---|
Corporate Author: | |
Additional Author(s): | Conway, Charles. Copen, Merlin D. Douma, J. H. Hendron, A. J. Leopold, A. Starker 1913-1983. Seed, H. Bolton Peck, Ralph B. Rohan, Dennis M. Merritt, Andrew H. |
Corporate Contributor(s): | Susitna Hydroelectric Project. External Review Panel. Alaska Power Authority. Board of Directors. Susitna Hydroelectric Project. Acres American External Review Panel. Meeting (1982 : Buffalo, N.Y.) Susitna Hydroelectric Project. External Review Panel. Meeting (1st : 1981 : Anchorage, Alaska) Susitna Hydroelectric Project. External Review Panel. Meeting (2nd : 1981 : Anchorage, Alaska) Susitna Hydroelectric Project. External Review Panel. Meeting (3rd : 1981 : Buffalo, N.Y.) Susitna Hydroelectric Project. External Review Panel. Meeting (4th : 1982 : Anchorage, Alaska) Susitna Hydroelectric Project. External Review Panel. Meeting (5th : 1982 : Buffalo, N.Y.) Susitna Hydroelectric Project. External Review Panel. Meeting (6th : 1982) |
Publisher: | [Alaska Power Authority], |
Report Numbers: | APA 2954 APA 2955 SUS 65 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2954-2955. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This document contains a series of reports and comments of the Alaska Power Authority's External Review Panel on the Susitna Hydroelectric Project based on their review of the comprehensive Feasibility Report prepared by Acres American, Inc. Reports are dated from January 1981 to April 1982. Included are seismic studies, environmental studies, fishery and wildlife studies, economic evaluations, geotechnical investigations, and hydraulic and hydrology considerations. |
---|---|
Physical Description: | 80 leaves in various foliations : 3 ill. ; 28 cm. |
Notes: | Title from cover. "April, 1982." Series statement from label on cover of some copies. The copies assigned both APA numbers are identical with only minor alterations to the cover of copies numbered 2955: the Harza-Ebasco Susitna Joint Venture series label is attached and "Panel Meeting #6" is handwritten. APA Document no. 2427 is similar to documents APA 2954 and 2955 with the following exceptions: APA 2427 lacks a cover; it includes the October 25, 1980 and November 18, 1981 letters to John Lawrence; it lacks the four illustrations accompanying "Susitna Hydroelectric Project Acres American External Review Panel report no. 4" (February 18, 1982); it includes the November 19, 1982 letter and August 12, 1983 letter with Engineering Sub-Panel Meeting report no. 1, both addressed to David D. Wozniak. In addition, Report no. 2 (June 5, 1981) is formatted slightly differently, but the text is the same. The handwritten Panel Meeting #6 wording on certain copies (which was carried over into the index entry) may indicate that this document was prepared for the sixth External Review Panel Meeting. |