Aquatic plan of study, fiscal year 1985 : report /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Fiscal year 1985 aquatic plan of study

Susitna Hydroelectric Project. Draft aquatic plan of study, fiscal year 1985

Draft aquatic plan of study, fiscal year 1985
Corporate Contributor(s):Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 591

SUS 263
Edition:Draft.
Series:Document (Susitna Hydroelectric Project) ; no. 591.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Long term goals of the Power Authority
  • Aquatic study team participants
  • FY85 study descriptions and prioritization
  • appendix A. Draft lower river study plan
  • appendix B. Draft navigation study plan.