Plan of study for Susitna hydropower feasibility analysis /
Plan of study presenting a program of activities for project feasibility analysis of hydroelectric development in the upper Susitna River basin in Alaska. Each activity is described along with a cost estimate for its completion.
Saved in:
Alternate Title: | Susitna hydropower plan of study |
---|---|
Corporate Contributor(s): | United States. Army. Corps of Engineers. Alaska District. Alaska. |
Publisher: | Dept. of the Army, Alaska District, U.S. Army Corps of Engineers, |
Report Numbers: | APA 3284 |
Edition: | [Final]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3284. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02433cam a2200529Ia 4500 | ||
---|---|---|---|
001 | 1624161 | ||
003 | SIRSI | ||
005 | 20160531015202.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 781226s1978 akuab bt f000 0 eng d | ||
040 | |a UDA |b eng |c UDA |d OCLCQ |d RLA |d UAB |d RLA |d OCLCQ |d RLA |d OCLCA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)4507305 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1424.A4 |b U5282 1978 | |
050 | 4 | |a TK1425.S8 |b A23 no. 3284 | |
088 | |a APA 3284 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Plan of study for Susitna hydropower feasibility analysis / |c prepared for the State of Alaska ; by Alaska District, U.S. Army Corps of Engineers. |
246 | 1 | 4 | |a Susitna hydropower plan of study |
250 | |a [Final]. | ||
260 | |a Anchorage, Alaska : |b Dept. of the Army, Alaska District, U.S. Army Corps of Engineers, |c [1978] | ||
300 | |a ii, 303 pages (some folded) : |b illustrations (1 color), maps (some color) ; |c 26 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "June 1978." | ||
500 | |a "Final Susitna Plan of Study"--Transmittal letter. | ||
510 | 3 | |a Assigned APA Document no. 3284 in Susitna Hydroelectric Project document index. | |
520 | |a Plan of study presenting a program of activities for project feasibility analysis of hydroelectric development in the upper Susitna River basin in Alaska. Each activity is described along with a cost estimate for its completion. | ||
530 | |a Available also in electronic format on the Internet. | ||
504 | |a Includes bibliographical references (pages 285-288). | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Planning. | |
650 | 0 | |a Hydroelectric power plants |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Water resources development |z Alaska |z Susitna River. | |
650 | 0 | |a Hydrology |x Research |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization. | |
710 | 1 | |a United States. |b Army. |b Corps of Engineers. |b Alaska District. | |
710 | 1 | |a Alaska. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3284. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/32/APA3284.pdf |z ARLIS Document Server |
596 | |a 9 10 11 23 24 74 | ||
977 | |a o04507305 | ||
901 | |a 0104 |c TC425.S9U53 | ||
098 | |a APA 03284 | ||
901 | |a 0057 |c ALASKA TC425.S9U5 |c DOCS D 103.2:S726/2 |