Task 3, Hydrology. Reservoir sedimentation /
"The purpose of this report is to present the results of analyses of sedimentation within the proposed Watana and Devil Canyon Reservoirs."--Leaf 1-1.
Saved in:
Alternate Title: | Reservoir sedimentation Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Reservoir sedimentation Susitna Hydroelectric Project. Reservoir sedimentation |
---|---|
Corporate Contributor(s): | R & M Consultants, Acres American Incorporated, Susitna Hydroelectric Project Alaska Power Authority, |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 455 APA 1242 SUS 10 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 455. Document (Susitna Hydroelectric Project) ; no. 1242. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "The purpose of this report is to present the results of analyses of sedimentation within the proposed Watana and Devil Canyon Reservoirs."--Leaf 1-1. |
---|---|
Physical Description: | 54 pages in various pagings : illustrations ; 28 cm |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. At head of cover title: Susitna Hydroelectric Project. "Prepared for Acres American Incorporated." "January 1982." This report was also issued as "Appendix B.8, Reservoir sedimentation" (APA 1248) and contains the same data as that report. |
Bibliography: | Includes bibliographical references. |