Task 7, Environmental. Subtask 7.10, Fish ecology. A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project /
In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Project. The application for license is to be submitted to FERC. Exhibit E of that application includes a discussion of effects of existing instream flow uses...
Saved in:
Alternate Title: | Survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project. Susitna Hydroelectric Project. Task 7, Environmental. Subtask 7.10, Fish ecology. A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project Subtask 7.10, Fish ecology. A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project |
---|---|
Main Author: | |
Additional Author(s): | Trihey, E. Woody, |
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority, |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 478 SUS 11 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 478. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04358cam a2200649Ia 4500 | ||
---|---|---|---|
001 | 1508822 | ||
003 | SIRSI | ||
005 | 20140829173003.0 | ||
007 | ta | ||
007 | he bm|b|ca||| | ||
007 | cr cn||a|||||| | ||
008 | 951020s1981 aku b s000 0 eng d | ||
040 | |a UAA |b eng |c UAA |d RLA |d OCLCQ |d OCLCF |d RLA | ||
035 | |a (OCoLC)33339893 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 478 | |
050 | 4 | |a TK1425.S9 |b S95 no. 7.10e | |
088 | |a APA 478 | ||
088 | |a SUS 11 | ||
100 | 1 | |a Dwight, Linda Perry, |e author. | |
240 | 1 | 0 | |a Survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project. |s Alaska Power Authority version |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1981] | ||
245 | 1 | 0 | |a Task 7, Environmental. |n Subtask 7.10, |p Fish ecology. |p A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project / |c prepared by Linda Perry Dwight and E. Wood Trihey ; prepared for Acres American Inc. |
246 | 3 | |a Susitna Hydroelectric Project. |n Task 7, |p Environmental. |n Subtask 7.10, |p Fish ecology. |p A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project | |
246 | 3 | 0 | |a Subtask 7.10, |p Fish ecology. |p A survey of questions and concerns pertaining to instream flow aspects of the proposed Susitna Hydroelectric Project |
300 | |a 29 leaves, [66] p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "May 1, 1981." | ||
510 | 3 | |a Assigned APA Document no. 478 in the Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned SUS document no. 11 in the Susitna Aquatic Impact Assessment Project bibliography. | |
504 | |a Includes bibliographical references. | ||
500 | |a This document was issued by the Alaska Power Authority (APA) as an official publication of the Susitna Hydroelectric Project. The report was issued also as an unofficial document apparently by Acres American Inc. The textual content is the same as in that official publication, but this APA publication has a cover, new title page with different title statement, and different pagination, and the interview forms are rearranged. | ||
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a In November 1979 the Alaska Power Authority (APA) contracted Acres American Inc. to produce a feasibility plan for the Susitna Hydroelectric Project. The application for license is to be submitted to FERC. Exhibit E of that application includes a discussion of effects of existing instream flow uses on project water for irrigation, domestic supplies, and industrial and other purposes. To support that discussion in Exhibit E, an instream flow assessment is being conducted, and a telephone survey was undertaken in January 1981 as the initial step in the development of an instream flow study plan. This document contains a description and analysis of the survey and completed interview forms. As part of APA's public participation program, representatives of federal and state agencies, public interest groups, and Native corporations were interviewed. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Public opinion. |
650 | 0 | |a Instream flow |z Alaska |z Susitna River |x Public opinion. | |
650 | 0 | |a Water use |z Alaska |x Public opinion. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Public opinion. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Public opinion. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Public opinion. | |
650 | 0 | |a Natural resources surveys |z Alaska. | |
650 | 0 | |a Telephone surveys |z Alaska. | |
700 | 1 | |a Trihey, E. Woody, |e author. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority, |e issuing body. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 478. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/4/APA478.pdf |z ARLIS Document Server |
977 | |a o33339893 | ||
901 | |a 3755 |c TK1425.S8A23 no.478 | ||
901 | |a 0104 |c TK1424.A4S98 no.7.10b | ||
901 | |a 0057 |c ALASKA GB1225.A4D84 1981 | ||
596 | |a 9 10 11 23 24 | ||
098 | |a SUS 00011 | ||
098 | |a APA 00478 |