Inflow design flood study, Vee Damsite, Vee Project, Alaska.

This memorandum was written in response to a request on Dec. 21, 1962 to conduct inflow design flood studies for the proposed Vee Dam. This study makes recommendation for the maximum mean daily discharge at the Vee Dam site (located at the present gaging station on the Susitna River at N 63°42ʹ lati...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on subject line on letter of transmittal: Inflow design flood study for Vee Damsite, Vee Project, Alaska
Main Author: Miller, Donald L.
Corporate Contributor(s):United States. Bureau of Reclamation. Hydrology Branch.

United States. Bureau of Reclamation. Flood Hydrology Section.
Publisher:Hydrology Branch, Div. of Project Invest. [i.e. Investigations, U.S. Dept. of the Interior, Bureau of Reclamation],
Report Numbers:APA 4113
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This memorandum was written in response to a request on Dec. 21, 1962 to conduct inflow design flood studies for the proposed Vee Dam. This study makes recommendation for the maximum mean daily discharge at the Vee Dam site (located at the present gaging station on the Susitna River at N 63°42ʹ latitude, W 147°32ʹ50ʺ longitude) with and without construction of the Denali Dam. This report belongs to a group of early reports of the anticipated Susitna Hydroelectric Project.
Physical Description:2, 10 leaves, [9] leaves of plates : 7 graphs, 1 map ; 28 cm
Notes:Title from memorandum subject line on memorandum.

A memorandum addressed to Head, Flood Hydrology Section, from Donald L. Miller, dated Mar. 26, 1963 on p. [1].

Accompanied by a two-page letter of transmittal addressed to Bureau of Reclamation District Manager, Juneau, Alaska, from Chief Development Engineer, hand-dated Apr. 4, 1963.