Task 3, Hydrology. Processed climatic data. Volume 6, Devil Canyon Station /

The Devil Canyon Climate Station was installed on July 17, 1980, on a ridge on the South bank of the Susitna River one half mile downstream of the Devil Canyon damsite. The data were collected using a Digital Weather Station manufactured by Meteorology Research Incorporated (MRI). Climatic data in t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Handwritten title on R & M Consultants binder: Susitna Hydroelectric Project. Processed climatic data. Volume 6, Devil Canyon Station

Processed climatic data. Volume 6, Devil Canyon Station, July 17, 1980 thru September 30, 1981

Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Processed climatic data. Volume 6, Devil Canyon Station

Processed climatic data. Volume 6, Devil Canyon Station
Corporate Contributor(s):R & M Consultants,

Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:R & M Consultants, Inc.,

Alaska Power Authority
Report Numbers:APA 208

APA 1238

SUS 171
Series:Document (Susitna Hydroelectric Project) ; no. 208.
Document (Susitna Hydroelectric Project) ; no. 1238.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04896cam a2200781Ia 4500
001 1100695
003 SIRSI
005 20160816203540.0
007 ta
007 he bmu---bbca
007 cr bn||a||||||
008 061220e198203 akuad st s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCF  |d OCLCQ  |d RLA  |d OCL  |d RLA 
035 |a (OCoLC)77151554 
043 |a n-us-ak 
045 2 |b d19800717  |b d19810930 
050 4 |a TK1425.S8  |b A23 no. 1238 
088 |a APA 208 
088 |a APA 1238 
088 |a SUS 171 
245 0 0 |a Task 3, Hydrology.  |p Processed climatic data.  |n Volume 6,  |p Devil Canyon Station /  |c prepared by R & M Consultants, Inc. 
246 1 |i Handwritten title on R & M Consultants binder:  |a Susitna Hydroelectric Project.  |p Processed climatic data.  |n Volume 6,  |p Devil Canyon Station 
246 1 5 |a Processed climatic data.  |n Volume 6,  |p Devil Canyon Station, July 17, 1980 thru September 30, 1981 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 3,  |p Hydrology.  |p Processed climatic data.  |n Volume 6,  |p Devil Canyon Station 
246 3 0 |a Processed climatic data.  |n Volume 6,  |p Devil Canyon Station 
260 |3 Initial distribution:  |a Anchorage, Alaska :  |b R & M Consultants, Inc.,  |c [1982] 
260 3 |3 Later distribution:  |a [Alaska] :  |b Alaska Power Authority 
300 |a 1 volume :  |b illustrations ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 208 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a At head of cover title: Susitna Hydroelectric Project. 
500 |a "Prepared for Acres American Incorporated." 
500 |a Chiefly tables. 
500 |a "March 1982." 
500 |a All copies were distributed with one set of data for the entire month of July 1981 (9 pages). Some copies were distributed with an additional set of preliminary data for July 1981 (also 9 pages) that cover only the first two and half days of July. 
500 |a The copies without the additional set of preliminary data for July 1981 contain 142 pages. The copies with the July 1981 preliminary data contain 151 pages (known to be issued at least in some copies published by Alaska Power Authority). 
550 |a Earlier copies released by R & M Consultants, Inc.; later copies released by Alaska Power Authority. Consult cover for publisher. 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 208 in Susitna Hydroelectric Project document index. Also assigned no. 1238 (duplicate number). 
510 3 |a Assigned number SUS 171 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format (the additional pages of preliminary data for July 1981 were not filmed). 
530 |a Available also in electronic format on the Internet. 
520 |a The Devil Canyon Climate Station was installed on July 17, 1980, on a ridge on the South bank of the Susitna River one half mile downstream of the Devil Canyon damsite. The data were collected using a Digital Weather Station manufactured by Meteorology Research Incorporated (MRI). Climatic data in this report cover July 17, 1980 through September 30, 1981 excluding a one-month period between 1:00 pm on August 12, 1981 and 11:00 am on September 14, 1981. 
522 8 |a Devils Canyon (GNIS uses the form "Devils") is located between the Devil Creek and Portage Creek tributaries. 
651 0 |a Devils Canyon (Alaska)  |x Climate  |v Observations. 
651 0 |a Susitna River Valley (Alaska)  |x Climate  |v Observations. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Climatology.  |2 fast  |0 (OCoLC)fst00864281 
651 7 |a Alaska  |z Susitna River Valley  |2 fast  |0 (OCoLC)fst01273501 
651 7 |a Alaska  |z Devils Canyon.  |2 fast  |0 (OCoLC)fst01870232 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
655 7 |a Observations.  |2 fast  |0 (OCoLC)fst01423822 
710 2 |a R & M Consultants,  |e creator. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture.  |5 AkARLIS 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 208. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1238. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1238.pdf  |3 Direct link to this volume. Includes the additional set of nine pages of preliminary data for July 1981.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1233.html  |3 List of all volumes in the 1980-1981 climatic data set.  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00208 
098 |a SUS 00171 
098 |a APA 01238